IBM Support

SE55737: PERFORMANCE ADVISOR: REFRESHING SESSION DOES NOT LOAD COMPLETED ACTIVITIES IF PROJECT CONTEXT NOT SAME AS BUILD CONTEXT

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • In RD AIX and Linux 9.0 and earlier Performance Advisor with
    scheduled activities and a synchronized project that uses
    multiple project contexts, refreshing the session after the
    scheduled activity has completed will quietly fail to load the
    activity if project's current context does not match the build
    context selected when the session was created.
    
    To load the completed activities, change the project context
    to the session's build context, then refresh the session.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED: Users of RDAL Performance Advisor's          *
    *                 Scheduled Activities feature.                *
    ****************************************************************
    * PROBLEM DESCRIPTION: Refresh Session action for Scheduled    *
    *                      Activities may quietly fail to retrieve *
    *                      performance results.                    *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    The Scheduled Activities feature of RDAL Performance Advisor
    requires the user to manually refresh the Session when the
    activity is expected to be complete. If the Session is
    associated with a project that has multiple contexts, and
    the Session context is not the project's current primary
    context, the Refresh action will fail to retrieve the results
    of the scheduled performance run from the correct context,
    and no error indication is given.
    

Problem conclusion

  • This problem is fixed in the RDAL 9.0.1 update.
    

Temporary fix

Comments

APAR Information

  • APAR number

    SE55737

  • Reported component name

    RAL DEV FOR AIX

  • Reported component ID

    5725L1100

  • Reported release

    900

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2013-06-17

  • Closed date

    2014-01-16

  • Last modified date

    2014-01-16

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    RAL DEV FOR AIX

  • Fixed component ID

    5725L1100

Applicable component levels

  • R900 PSY

       UP

[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSPSQF","label":"Rational Developer for AIX and Linux"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"9.0","Edition":"","Line of Business":{"code":"LOB57","label":"Power"}}]

Document Information

Modified date:
16 January 2014