A fix is available
APAR status
Closed as fixed if next.
Error description
When the RPG program verifier is called to refresh the Outline View it fails for a main program PI spec which has no following parms, but the preceding PR (for the main pgm) had a parm. The failure of the program verifier causes RDP itself to end abruptly.
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: Those who edit RPGLE source. * **************************************************************** * PROBLEM DESCRIPTION: The workbench ends abruptly when the * * Outline View is refreshed for an RPGLE * * source member. * **************************************************************** * RECOMMENDATION: * **************************************************************** The RPGLE program verifier gets a null pointer error when called for an Outline View refresh for RPGLE source which has a main program PI spec which has no following parms, but the preceding PR (for the main pgm) had a parm.
Problem conclusion
Temporary fix
Comments
APAR Information
APAR number
SE51245
Reported component name
RPG/COBOL DEV T
Reported component ID
5724Y9901
Reported release
803
Status
CLOSED FIN
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2012-03-22
Closed date
2012-06-15
Last modified date
2012-06-15
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Applicable component levels
R803 PSY
UP
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SS4QVT","label":"Rational Developer for Power Systems Software"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.0.3","Edition":"","Line of Business":{"code":"LOB08","label":"Cognitive Systems"}}]
Document Information
Modified date:
15 June 2012