PM78289: ELAPSED TIME BETWEEN THE CWLRB5020I MESSAGES IN COMPUTE GRID DUE TO PHASE 2 OF TWO-PHASE JOB SUBMISSION PATH.

Subscribe

You can track all active APARs for this component.

APAR status

  • Closed as program error.

Error description

  • ELAPSED TIME BETWEEN THE CWLRB5020I MESSAGES IN COMPUTE GRID
    due to phase 2 of two-phase job submission path.
    

Local fix

  • None:
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:  All WebSphere Compute Grid version 8.0      *
    *                  users.                                      *
    ****************************************************************
    * PROBLEM DESCRIPTION: The elapsed time between                *
    *                      CWLRB5020I messages in the wsgrid       *
    *                      client logs can be relatively           *
    *                      long.                                   *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    The elapsed time between the CWLRB5020I messages is higher
    than expected due to the processing in phase 2 of the two
    phase job submission.
    

Problem conclusion

  • The scheduler algorithm to obtain the jobid in phase 2 has been
    updated to increase efficiency.
    The fix for this APAR is currently targeted for inclusion in
    fixpack 8.0.0.3.
    Please refer to the Recommended Updates page for delivery
    information:
    http://www.ibm.com/support/docview.wss?uid=swg27022998
    

Temporary fix

Comments

APAR Information

  • APAR number

    PM78289

  • Reported component name

    WXD COMPUTE GRI

  • Reported component ID

    5725C9301

  • Reported release

    800

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2012-12-03

  • Closed date

    2013-08-13

  • Last modified date

    2013-08-13

  • APAR is sysrouted FROM one or more of the following:

    PM70896

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    WXD COMPUTE GRI

  • Fixed component ID

    5725C9301

Applicable component levels

  • R800 PSY

       UP



Rate this page:

(0 users)Average rating

Document information


More support for:

WebSphere Extended Deployment Compute Grid
General

Software version:

8.0

Reference #:

PM78289

Modified date:

2013-08-13

Translate my page

Machine Translation

Content navigation