A fix is available
APAR status
Closed as program error.
Error description
DB2DDF defect pm75890 dpm75890 ABND=0C4-00000011,U=SYSOPR ,M=(N),C=910.IPC -DSNYASCP,M=DSNYECTE,LOC=DSNTLM2 .DSNTLRES+0076 occurred when IDAA command -START ACCEL(xxxx) SCOPE(GROUP) is issued. DB2 crashed with DSNV086E DB2 ABNORMAL TERMINATION REASON=00E80100. *************************************************************** Additional symptoms and keywords: ABEND0C4 ABND0C4 S00C4 0C4 00000011 RC00000011 PIC11 DSNLTRES+0076 +0076 OFFSET0076 OFFSET76 RLPL IDAAV2R1/K and IDAAV3R1/K
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: All DB2 9 for z/OS and DB2 10 for z/OS users * * of IBM DB2 Analytics Accelerator (IDAA). * **************************************************************** * PROBLEM DESCRIPTION: ABEND0C4-00000011 DSNTLRES+0076 * * occurred when the * * -START ACCEL SCOPE(GROUP) command was * * issued at a DB2 for z/OS system. * **************************************************************** * RECOMMENDATION: * **************************************************************** The -START ACCEL SCOPE(GROUP) DB2 command was issued at a DB2 subsystem to start a specified accelerator server. When the SCOPE(GROUP) option is specified in the -START ACCEL command, DB2 attempts to acquire a lock from IRLM in order to serialize related commands (-START ACCEL, -DISPLAY ACCEL, and -STOP ACCEL) across the data sharing group. In this case, the DB2 -START ACCEL command processor was unable to acquire the lock (due to lock contention) so IRLM suspended the lock request until the requested lock becomes available. However, the DB2 system thread that was servicing the -START ACCEL SCOPE(GROUP) command was canceled while the thread was suspended in IRLM. So during DB2 recovery processing, DB2 incorrectly freed the (RLPL) parameter list (which contains lock request information for IRLM). When IRLM finally honored the (suspended) lock request, DB2 abended with 0C4-00000011 because the IRLM RLPL has been freed and thus the storage is no longer related to the IRLM lock request for the DB2 -START ACCEL SCOPE(GROUP) command.
Problem conclusion
DB2 query accelerator command processor has been changed to not free the IRLM RLPL parameter list during the recovery processing.
Temporary fix
Comments
APAR Information
APAR number
PM75890
Reported component name
DB2 OS/390 & Z/
Reported component ID
5740XYR00
Reported release
910
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2012-10-25
Closed date
2012-11-19
Last modified date
2013-01-02
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
UK83649 UK83650
Modules/Macros
DSNX8CMD
Fix information
Fixed component name
DB2 OS/390 & Z/
Fixed component ID
5740XYR00
Applicable component levels
Fix is available
Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSEPEK","label":"Db2 for z\/OS"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"9.1","Edition":"","Line of Business":{"code":"LOB10","label":"Data and AI"}},{"Business Unit":{"code":"BU054","label":"Systems w\/TPS"},"Product":{"code":"SG19M","label":"APARs - z\/OS environment"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"9.1","Edition":"","Line of Business":{"code":"","label":""}}]
Document Information
Modified date:
02 January 2013