A fix is available
APAR status
Closed as program error.
Error description
IXL040E CONNECTOR NAME: DB2_DAA1, JOBNAME: DAA1DBM1, ASID: 0093 HAS NOT RESPONDED TO THE REBUILD QUIESCE EVENT. REBUILD PROCESSING FOR STRUCTURE DAA0_GBP6 CANNOT CONTINUE. MONITORING FOR RESPONSE STARTED: 08/12/2012 09:28:03. DIAG: 0000 0000 00000000 . Dump Title: ABEND S026 REASON 08118001 CONNECTOR HANG CONNAME=DB2_DAA1 JOBNAME=DAA1DBM1 REALLOCATE of a duplex GBP may issue above message and ABEND after message MSGDSNB743I if the GBP is in shortage status. . DSNB743I -DAA1 DSNB1GBR DUPLEXING IS BEING STOPPED FOR GROUP BUFFER POOL GBP6 FALLING BACK TO PRIMARY REASON = OPERATOR DB2 REASON CODE = 00000000 . This may cause DB2 crash by ABENDS026 RSN08110102 if CFSTRHANGTIME interval is defined in the SFM policy.
Local fix
Don't issue REALLOCATE to duplex GBP while it is in shortage status ( message DSNB319A and DSNB325A ).
Problem summary
**************************************************************** * USERS AFFECTED: DB2 data sharing users. * **************************************************************** * PROBLEM DESCRIPTION: Various types of delays following a * * rebuild of a group buffer pool. This * * can result in application hangs, lock * * timeouts, or IXL040E messages stating * * that DB2 is not responding to a rebuild * * event. * **************************************************************** * RECOMMENDATION: * **************************************************************** At the end of a group buffer pool rebuild, DB2 goes through a "resume castout" process attempting to reschedule castouts that were interrupted by the rebuild. There are timing windows that can cause this process to take longer than it should (waiting for castouts that started after the rebuild finished), or even to take forever (waiting for castout completion when no castout engine is actually running). These delays can cause application hangs, usually waiting on a drain lock held by the pseudo-close process. They can also cause subsequent GBP rebuild events to be ignored, resulting in IXL040E messages complaining that DB2 is not responding.
Problem conclusion
The pageset castout logic has been modified to no longer handle a GBP rebuild by requeueing its request and terminating the engine, requiring a reschedule at the end of the rebuild. The castout engine will now remain active but wait on the GBP fence for the rebuild to complete. Additionally, the "resume castout" step at the end of the GBP rebuild has been eliminated.
Temporary fix
Comments
APAR Information
APAR number
PM72512
Reported component name
DB2 OS/390 & Z/
Reported component ID
5740XYR00
Reported release
A10
Status
CLOSED PER
PE
NoPE
HIPER
YesHIPER
Special Attention
NoSpecatt
Submitted date
2012-09-10
Closed date
2012-11-14
Last modified date
2013-01-25
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
UK83514 UK83515
Modules/Macros
DSNB1GBR DSNB1PCD DSNB5PCO
Fix information
Fixed component name
DB2 OS/390 & Z/
Fixed component ID
5740XYR00
Applicable component levels
Fix is available
Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSEPEK","label":"Db2 for z\/OS"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"10.1","Edition":"","Line of Business":{"code":"LOB10","label":"Data and AI"}},{"Business Unit":{"code":"BU054","label":"Systems w\/TPS"},"Product":{"code":"SG19M","label":"APARs - z\/OS environment"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"10.1","Edition":"","Line of Business":{"code":"","label":""}}]
Document Information
Modified date:
25 January 2013