APAR status
Closed as program error.
Error description
Error Message: When trying to get 53rd week of year 2009, the week returned is 1 for UK and France locales. . Stack Trace: N/A .
Local fix
Problem summary
The problem is caused because minimum days in first week is wrongly set for UK and France locales. Sun has fixed the bug through Sunbug 4960215.
Problem conclusion
This defect will be fixed in: 1.4.2 SR13 FP5 . The JVM has been updated to get correct minimum days in first week by porting changes from sunbug 4960215. . To obtain the fix: Install build 20100224 or later
Temporary fix
Comments
APAR Information
APAR number
PM07217
Reported component name
JAVA(1.3/1.4 CO
Reported component ID
5648C9800
Reported release
42A
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2010-02-10
Closed date
2010-02-25
Last modified date
2010-02-25
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
JAVA(1.3/1.4 CO
Fixed component ID
5648C9800
Applicable component levels
R42A PSN
UP
R42L PSN
UP
R42W PSN
UP
R420 PSN
UP
[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SUPPORT","label":"IBM Worldwide Support"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"1.4.2","Edition":"","Line of Business":{"code":"","label":""}}]
Document Information
Modified date:
09 February 2022