IBM Support

PI95967: SCHEDULED REPORTS SAVING TO FILE SYSTEM ARE ALL FAILING WITH ERROR MESSAGE

Subscribe

You can track all active APARs for this component.

APAR status

  • Closed as fixed if next.

Error description

  • Scheduled reports saving to file system are all failing with
    error message: CNC-SDS-0425 Failed to lock resource
    DistributedResourceLock
    [lockOwner=45982132433707E801605B6471C28000,
    resource=A9013950411509CF9ADCCFCC2CBA7B45] : null</trace>
    

Local fix

  • No work around
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * All Users                                                    *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * See Error Description                                        *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Upgrade to IBM Cognos Analytic 11.0.13.0                     *
    ****************************************************************
    

Problem conclusion

Temporary fix

Comments

APAR Information

  • APAR number

    PI95967

  • Reported component name

    COG WRKSPC

  • Reported component ID

    5724W12BI

  • Reported release

    A21

  • Status

    CLOSED FIN

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2018-03-29

  • Closed date

    2018-11-02

  • Last modified date

    2018-11-02

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

Applicable component levels



Document information

More support for: Cognos Business Intelligence
Cognos Workspace

Software version: 10.2.1

Reference #: PI95967

Modified date: 02 November 2018


Translate this page: