Error description

  • ABN=5C6-00D10341,U=SYSOPR,
    M=CSQJRE01,LOC=CSQJL002.CSQJR103
     When using striped active logs, it is possible that the rewrite
    of a CI does not get mirrored, although the write of the next CI
    is mirrored (same situation as DB2 APAR PI10353/PI15425),
    resulting in the 5C6-00D10341 abend issued by CSQJR103.
    

Local fix

  • Use CSQ1LOGP to determine if the log copy 2 dataset ends at a
    higher RBA than the corresponding log copy 1 dataset. If so,
    copy the log copy 2 dataset over the log copy 1 dataset.
    
    An indication that a log dataset is missing the rewrite of a CI
    is given by the following message towards the end of the
    CSQ1LOGP output:
    
    CSQ1216E LOG READ ERROR, RETCODE=00000004 REASON CODE=00D10063,
             RBA=xxxxxxxxxxxx
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED: All users of IBM MQ for z/OS Version 9       *
    *                 Release 0 Modification 0.                    *
    ****************************************************************
    * PROBLEM DESCRIPTION: Abend 5C6-00D10341 is issued by         *
    *                      CSQJR103 during queue manager restart,  *
    *                      or when reading a peer queue managers   *
    *                      logs, following abnormal queue manager  *
    *                      termination, or when using a mirrored   *
    *                      copy of the logs.                       *
    *                      The problem occurs when using log       *
    *                      striping for the active logs.           *
    *                      The abend is followed by abnormal       *
    *                      queue manager termination 6C6.          *
    ****************************************************************
    A multi-CI I/O request was made to write to the active logs.
    As the logs were striped, the individual CIs were written out
    of order, and before the I/O was complete either the queue
    manager terminated, or a mirrored copy of the logs was taken
    prior to the rewrite of the first CI completing..
    
    During queue manager startup, log replay read from the 1st/only
    copy of the logs, and did not detect the missed rewrite while
    locating the end of the log.
    This included the start of a spanned record.
    When CSQJR103 subsequently processed the logs, it found the
    middle/end segment of a record at the start of the following CI
    and abended as the start segment had not been found.
    
    Similarly, when reading the logs of a peer queue manager that
    are missing the rewrite of a CI (for example, during peer admin
    rebuild, or groupur processing for an inactive queue manager)
    CSQJR103 abends and the queue manager reading the logs
    terminates.
    

Problem conclusion

  • CSQJW009 is changed to perform additional validation of striped
    active logs when locating the end RBA of the logs. If this
    results in a difference between the end RBA of logcopy1 and
    logcopy2, the shorter log, containing the missed CI, is
    truncated to ensure the CI is read from the other logcopy.
    
    CSQJR103 is changed to handle a missed CI when reading the
    active logs for a failed peer.
    

Temporary fix

Comments

APAR Information

  • APAR number

    PI88138

  • Reported component name

    IBM MQ Z/OS V9

  • Reported component ID

    5655MQ900

  • Reported release

    000

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    YesHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2017-09-29

  • Closed date

    2017-10-13

  • Last modified date

    2017-12-02

  • APAR is sysrouted FROM one or more of the following:

    PI77705

  • APAR is sysrouted TO one or more of the following:

    UI51094

Modules/Macros

  • CSQJR103 CSQJW009
    

Fix information

  • Fixed component name

    IBM MQ Z/OS V9

  • Fixed component ID

    5655MQ900

Applicable component levels

  • R000 PSY UI51094

       UP17/11/21 P F711 ¢

Fix is available

  • Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.

[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSYHRD","label":"IBM MQ"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"9.0","Edition":"","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
02 December 2017