APAR status
Closed as program error.
Error description
Prompt checking in DQM takes much more time as in CQM with Run As A DQM report with prompt page executed with Run As (or just executed) took much more time for prompt checking (sometimes never finished) as with CQM This is browser independent
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * All Users * **************************************************************** * PROBLEM DESCRIPTION: * * See Error Description * **************************************************************** * RECOMMENDATION: * * Upgrade to IBM Cognos Business Intelligence 10.2.1 Fix Pack * * 13 * ****************************************************************
Problem conclusion
Code Fix
Temporary fix
Comments
A fix for this APAR is targeted for IBM COGNOS 10.2.1 BI Fix Pack 13. The Fix Pack Release Schedule can be found at http://www.ibm.com/software/analytics/support/fixes/pbi_schedule .html.
APAR Information
APAR number
PI80501
Reported component name
COG REPORT STUD
Reported component ID
5724W12RS
Reported release
A21
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2017-04-25
Closed date
2017-07-12
Last modified date
2017-07-12
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
COG REPORT STUD
Fixed component ID
5724W12RS
Applicable component levels
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSTSF6","label":"IBM Cognos Analytics"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Line of Business":{"code":"LOB10","label":"Data and AI"}}]
Document Information
Modified date:
14 December 2020