A fix is available
APAR status
Closed as program error.
Error description
OPC panel 5.1 permit to add GROUP in CP while the OCL cannot handle this.
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: ALL TWS for z/OS 910, 920 and * * IWS for z/OS 930 Users * * FUNCTION=OCL. * **************************************************************** * PROBLEM DESCRIPTION: When two applications in a group are * * mutually dependent, the OCL add group * * function fails with the message * * EQQCL7QE * **************************************************************** When two applications in a group are mutually dependent, the OCL add group function fails with the message EQQCL7QE
Problem conclusion
The OCL cannot handle the add group when the group contains applications mutually dependent. In this case it fails with the message EQQCL7QE. The new parameter LOOPDEP(YES/NO) has been added. When LOOPDEP(NO) is specified, the check, for mutually dependent applications in the group, is not done. Otherwise the check is done. THE FOLLOWING TWS FOR Z/OS PUBLICATION WILL BE UPDATED: - - - +-------------------------------------------------------------+ |TITLE: IBM Workload Scheduler for z/OS | | Messages and Codes | | Version 9.3 | | Tivoli Workload Automation | | Messages and Codes | | Version 9.1 | | Version 9.2 | |-------------------------------------------------------------| |CHAPTER : EQQCLnnn messages | |The message EQQCL7QE has to be documented: | |EQQCL7QE Applications in GROUP(&XGRP) are mutually | | dependent | |Explanation: The application group contains applications | | mutually dependent. Say A10 and A20 are | | operations in application A, A10 predecessor | | to A20, and B10 is an operations in B. | | If A10 is a predecessor to B10 and B10 a | | predecessor to A20, A and B are mutually | | dependent. The mutual dependency could also | | be via other applications in the group. | | OCL cannot handle such dependencies. | |System action: The request to add group is rejected. | | | |User response: Break up one of the applications given by | | the messages EQQCL7RI into two to get the | | predecessor operation (A10) in the chain in | | one application and the successor operation | | (A20) in another application. | |-------------------------------------------------------------| +-------------------------------------------------------------+ |TITLE: Driving IBM Workload Scheduler for | | z/OS | | Version 9.3 | | Driving Tivoli Workload Scheduler for | | z/OS | | Version 9.1 | | Version 9.2 | |-------------------------------------------------------------| |Chapter Control Language (OCL) | |Section: Customizing OCL | | | |The new parameter LOOPDEP has to be added, after the | |INCVALUE() parameter, with the following description: | |the OCL cannot handle the add group when the group contains | |applications mutually dependent. In this case it fails with | |the message EQQCL7QE. | |If the new parameter LOOPDEP(NO) is | |specified, the check, for mutually dependent applications in | |the group, is not done. Otherwise the check is done. | |The Default value is YES. | |-------------------------------------------------------------|
Temporary fix
Comments
APAR Information
APAR number
PI79679
Reported component name
TIV WRKLD SCHD
Reported component ID
5697WSZ01
Reported release
920
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2017-04-10
Closed date
2017-08-29
Last modified date
2017-11-01
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
UI49881 UI49882 UI49883
Modules/Macros
EQQOCL EQQOCL1
SC32126609 | SC32126608 | SC23911407 | SC23911406 |
Fix information
Fixed component name
TIV WRKLD SCHD
Fixed component ID
5697WSZ01
Applicable component levels
R910 PSY UI49881
UP17/10/05 P F710
R920 PSY UI49882
UP17/10/05 P F710
R930 PSY UI49883
UP17/10/05 P F710
Fix is available
Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSRULV","label":"IBM Workload Scheduler for z\/OS"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"920","Edition":"","Line of Business":{"code":"LOB35","label":"Mainframe SW"}},{"Business Unit":{"code":"BU054","label":"Systems w\/TPS"},"Product":{"code":"SG19M","label":"APARs - z\/OS environment"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"920","Edition":"","Line of Business":{"code":"","label":""}}]
Document Information
Modified date:
01 November 2017