A fix is available
APAR status
Closed as program error.
Error description
When the Critical Path task has a lot of requests to handle (due to the late messages on critical jobs) and the EQQN082E is issued, the NMM task cannot stop contrary to the explanation of the message. NMM doesn't stop after the message EQQN082E
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: TWS for z/OS 9.1, 9.2 and IWS for z/OS 9.3 * * users using Dynamic Critical Path * * FUNCTION=CPH * **************************************************************** * PROBLEM DESCRIPTION: The NMM task does not stop when the * * EQQN082E message is issued. * **************************************************************** * RECOMMENDATION: * **************************************************************** The NMM task does not stop when the EQQN082E message is issued.
Problem conclusion
When the EQQN011E is issued for the current JT, the CPH is forced to unlock a resource necessary to the NMM task to start the BACKUP. When the EQQN082E is issued the CPH task is posted to stop together with the NMM task.
Temporary fix
Comments
APAR Information
APAR number
PI78919
Reported component name
TIV WRKLD SCHD
Reported component ID
5697WSZ01
Reported release
920
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2017-03-28
Closed date
2017-05-23
Last modified date
2017-06-02
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
UI46805 UI46806 UI46807
Modules/Macros
EQQCPHQH EQQNMJTS EQQNMLIO
Fix information
Fixed component name
TIV WRKLD SCHD
Fixed component ID
5697WSZ01
Applicable component levels
R912 PSY UI46805
UP17/05/31 P F705
R922 PSY UI46806
UP17/05/31 P F705
R932 PSY UI46807
UP17/05/31 P F705
Fix is available
Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSRULV","label":"IBM Workload Scheduler for z\/OS"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"920","Edition":"","Line of Business":{"code":"LOB35","label":"Mainframe SW"}},{"Business Unit":{"code":"BU054","label":"Systems w\/TPS"},"Product":{"code":"SG19M","label":"APARs - z\/OS environment"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"920","Edition":"","Line of Business":{"code":"","label":""}}]
Document Information
Modified date:
02 June 2017