Error description
Toolbar is stretched in IBM Rational Team Concert (RTC) Eclipse client when installing Client for Eclipse 4.2.x IDE. The problem is not there if one installs the Client for Eclipse 3.6.x IDE. The problem is not there either if you install an RTC 4.0.3 p2 on top of a vanilla Juno 4.2.x Steps to reproduce the issue with 4.0.4: Download the following zip https://jazz.net/downloads/rational-team-concert/releases/4.0.4/ RTC-Client-Eclipse4.2-repo-4.0.4.zip Unzip and install with IBM Installation Manager Actual behavior: The icons on the toolbar are stretched. It seems that there is a space for icons/groups that cannot be made available. See ? Window ? Customize Perspective ? Toolbar visibility Expected behavior: There should not be any space between the icons on the toolbar For more information see Work Item: https://jazz.net/jazz/resource/itemName/com.ibm.team.workitem.Wo rkItem/322978
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * Menu buttons in toolbar are not spaced correctly in IM RTC * * Eclipse Client based on Eclipse 4.2 * **************************************************************** * PROBLEM DESCRIPTION: * * The Coolbar/toolbar is stretched in RTC eclipse client when * * installing Client for Eclipse 4.2.x . This is not an issue * * when installing a client for for Eclipse 3.6.x IDE . The * * problem is not there either if you install an RTC 4.0.3 p2 * * on top of juno 4.2.x * * * * Also it appears that the toolbar items are not draggable, * * however this may be how the toolbar now works in 4.2. * **************************************************************** * RECOMMENDATION: * ****************************************************************
Problem conclusion
Fixed in version 5.0.2 See Jazz Workitem for additional details https://jazz.net/jazz/web/projects/Rational%20Team%20Concert#act ion=com.ibm.team.workitem.viewWorkItem&id=322978
Temporary fix
Comments
APAR Information
APAR number
PI08625
Reported component name
RATL TEAM CONCE
Reported component ID
5724V0400
Reported release
403
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2013-12-23
Closed date
2014-09-30
Last modified date
2014-09-30
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
RATL TEAM CONCE
Fixed component ID
5724V0400
Applicable component levels
R403 PSY
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSCP65","label":"Rational Team Concert"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"4.0.3","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
30 September 2014