A fix is available
APAR status
Closed as program error.
Error description
Users running MQ 9.2 for z/OS report that an activation specification fails with MQRC 2009 after it had previously been connected to MQ (z/OS) via BINDINGS mode. This follows an MQDISC then subsequent MQCONNX failing. Additional errors include : JSCMQ0001: IBM MQ call failed with compcode '2' ('MQCC_FAILED') reason '2009' ('MQRC_CONNECTION_BROKEN'). MQ Development finds this is during an attempt to reuse an invalid RRS context when a specific QSG name is specified for connectivity. * Additional keywords and symptoms: . CWSJY0003W: JMSCC3036: An exception has been delivered to the connection's exception listener: ' Message : com.ibm.msg.client.jms.DetailedJMSException: JMSWMQ1107: A problem with this connection has occurred. ... Caused by [1] --> Message : com.ibm.mq.MQException: JMSCMQ0001: IBM MQ call failed with compcode '2' ('MQCC_FAILED') reason '2009' ('MQRC_CONNECTION_BROKEN'). . MQJCA1011: Failed to allocate a JMS connection. ... Caused by: com.ibm.mq.MQException: JMSCMQ0001: IBM MQ call failed with compcode '2' ('MQCC_FAILED') reason '2351' ('MQRC_GLOBAL_UOW_CONFLICT'). . 2009 MQRC_CONNECTION_BROKEN 2351 MQRC_GLOBAL_UOW_CONFLICT
Local fix
It is feasible to connect to a specific qmgr that would avoid the issue until implementation of the permanent fix.
Problem summary
**************************************************************** * USERS AFFECTED: All users of IBM MQ for z/OS Version 9 * * Release 2 Modification 0. * **************************************************************** * PROBLEM DESCRIPTION: When a WebSphere Application Server * * application uses an activation * * specification, with authentication, to * * monitor an MQ queue in a QSG, if the * * QSG name is used for the binding * * connection name rather than a qmgr * * name, RC=2009 'MQRC_CONNECTION_BROKEN' * * may be seen on redeployment or * * activation specification restart. * **************************************************************** To optimise connection authentication processing, adapter stub code checks if there is an existing connection to the qmgr. When the QSG name is used for the connection the stub code can't detect the connection. CSQBCON processing has to be repeated, including authentication, reusing the bloa from the existing qmgr connection. There may be invalid residual data in the qrpl used for the ExpressInterest call in CSQMCPRH, leading to 'CTX_CONTEXT_TOKEN_INV' and hence 'MQRC_CONNECTION_BROKEN'. As a workaround the activation specification can be set to bind with a named qmgr instead of the QSG name.
Problem conclusion
CSQBCON has been corrected so as not to use residual qrpl data and tracing has been improved in CSQMCPRH.
Temporary fix
Comments
APAR Information
APAR number
PH41602
Reported component name
IBM MQ Z/OS V9
Reported component ID
5655MQ900
Reported release
200
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2021-10-26
Closed date
2022-02-15
Last modified date
2022-04-01
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
UI79326
Modules/Macros
CSQBCON CSQMCPRH
Fix information
Fixed component name
IBM MQ Z/OS V9
Fixed component ID
5655MQ900
Applicable component levels
R200 PSY UI79326
UP22/03/11 P F203
Fix is available
Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.
[{"Line of Business":{"code":"LOB45","label":"Automation"},"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSYHRD","label":"IBM MQ"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"200"}]
Document Information
Modified date:
02 April 2022