Error description
Accelerated Create Replica request failing when no DAOS is enabled Error message generated after the Accelerated Create Replica request is being completed/ failed when Synchronizing Unread marks. This should be more clear The message currently is confusing, stating that the Accelerated Created Replica is not being performed because the Database is DAOS enabled. The real scenario is that the Accelerated Created Replica is not being performed because the Administrator has choosen not to Synchronize Unread Marks. In the answering document appears the message: Action comments: Received the status -- Accelerated Create Replica request not supported for DAOS enabled databases. -- trying to create mail\test.nsf on South/Org; a replica creation request has been generated for further processing. Also on the source server North/Org console you can see: 19/10/2009 16:18:33 Admin Process: Received the following status performing a Accelerated Create Replica request on Test User. Received the status -- Accelerated Create Replica request not supported for DAOS enabled databases. -- trying to create mail\Test.nsf on south/Org; a replica creation request has been generated for further processing. The messages above from the AdminP request and in the Server Console, should be clear and not be related to DAOS STEPS to reproduce: 1. Set up to Domino Servers 8.5 North/Org Source server South/Org Target server DAOS is not enabled 2. Create a replication connection document from server target to source South/Org North/Org 2. In Notes Administrator Client go to > 1. Adminclient 2. Files 3. Select database and choose create new replica. 4. Select server in other location on the bottom on the screen, leave the option "Exchange Unread Marks on Replication" without checkmark 5. Click ok 5. In the Admin4.nsf of the Source Server North/Org you can see the following adminP request generated: * Check Access for New Replica Creation With completed answering document * Accelerated Create Replica In the answering document appears the message: Action comments: Received the status -- Accelerated Create Replica request not supported for DAOS enabled databases. -- trying to create mail\test.nsf on south/Org; a replica creation request has been generated for further processing. Also on the source server North/Org console you can see: 19/10/2009 16:18:33 Admin Process: Received the following status performing a Accelerated Create Replica request on Test User. Received the status -- Accelerated Create Replica request not supported for DAOS enabled databases. -- trying to create mail\Test.nsf on south/Org; a replica creation request has been generated for further processing. Once Accelerated Create Replica request has been completed with the above message a Create Replica request is Directly Deposited on the Admin4.nsf of the Target Server South/WWCorp. * Create Replica With completed answering document When checking the Target Server South/WWCorp: I can see a Replication Stub being created for the Test.nsf database, not yet populated with all the data. Once the Schedule replication is performing according to the Replication Connection Document from South to North. The Test.nsf replication stub is populated and the replication is completed.
Local fix
No workaround identified
Problem summary
A programming error was found but will not be corrected. It will be a permanent restriction.
Problem conclusion
A programming error was found but will not be corrected. It will be a permanent restriction.
Temporary fix
Comments
This APAR is associated with SPR# BBSZ7WZEK4.
APAR Information
APAR number
LO45506
Reported component name
DOMINO SERVER
Reported component ID
5724E6200
Reported release
850
Status
CLOSED PRS
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2009-10-20
Closed date
2010-03-11
Last modified date
2010-03-11
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Modules/Macros
NA
Fix information
Applicable component levels
[{"Business Unit":{"code":"BU055","label":"Cognitive Applications"},"Product":{"code":"SSKTMJ","label":"Lotus Domino"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.5","Edition":"","Line of Business":{"code":"","label":""}}]
Document Information
Modified date:
11 March 2010