A fix is available
APAR status
Closed as program error.
Error description
The value for the idle_timeout parameter is not being honored and, therefore, outages on the link are not being detected properly. This is causing the PU-LU status to appear as still active. Additional Symptom(s) Search Keyword(s):
Local fix
Problem summary
LLC2 link fails to timeout if the partner system fails suddenly (adapter fault or wire disconnect). The link will only then timeout when an application tries to send data on the link.
Problem conclusion
Corrected the idle timer code. The problem was introduced at CS Linux 6.2.2.0 and does NOT apply to CS/AIX.
Temporary fix
Comments
APAR Information
APAR number
LI77495
Reported component name
CS DCD LINUX 7.
Reported component ID
5725H3201
Reported release
700
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2013-07-10
Closed date
2013-07-10
Last modified date
2013-07-10
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
CS DCD LINUX 7.
Fixed component ID
5725H3201
Applicable component levels
R700 PSY
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSKK8Z","label":"Communications Server for Data Center Deployment"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"700","Line of Business":{"code":"LOB35","label":"Mainframe SW"}}]
Document Information
Modified date:
13 October 2021