IBM Support

JR55548: TABLE COLUMNS DO NOT DISPLAY REQUIRED MARKER IN THE HEADER WHEN DATA CELL VISIBILITY IS DYNAMICALLY SET TO REQUIRED

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as fixed if next.

Error description

  • When the coach view visibility of a Coaches toolkit Table stock
    control is dynamically set, and its data cells visibility is set
    to same as parent, the asterisk indicating "required" does not
    display on the corresponding column's header when the value of
    the table's visibility is set to required.
    
    PRODUCTS AFFECTED
    IBM Business Process Manager (BPM) Advanced
    IBM BPM Standard
    IBM BPM Express
    

Local fix

Problem summary

  • No additional information is available.
    

Problem conclusion

  • A fix is currently targeted for inclusion in an upcoming
    cumulative fix on IBM Business Process Manager (BPM) 8.5.7.0
    that appropriately displays the required mark in the table
    column header when the corresponding cell's visibility has been
    dynamically changed to required.
    

Temporary fix

Comments

APAR Information

  • APAR number

    JR55548

  • Reported component name

    BPM ADVANCED

  • Reported component ID

    5725C9400

  • Reported release

    856

  • Status

    CLOSED FIN

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2016-03-16

  • Closed date

    2016-04-04

  • Last modified date

    2016-04-04

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

Applicable component levels

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSFTN5","label":"IBM Business Process Manager Advanced"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"856","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
31 August 2023