IBM Support

JR53122: NULLPOINTEREXCEPTION WHEN YOU RUN A BPD IN SIMILUATION ENGINE THAT HAS AN EXCLUSIVE GATEWAY WITH NO OUTGOING FLOWS

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as fixed if next.

Error description

  • If a business process definition (BPD) contains an exclusive
    gateway that has no outgoing flows, an incomplete flow results
    and causes an NullPointerException in the simulation engine.
    
    PRODUCTS AFFECTED
    IBM Business Process Manager (BPM) Advanced
    IBM BPM Standard
    IBM BPM Express
    

Local fix

  • You could fix the flow by any of the following ways:
    
    -Using an end event
    -Using an activity with the implementation set to None
    -Removing that gateway
    

Problem summary

  • No additional information is available.
    

Problem conclusion

  • A fix will be incorporated into a later release that allows the
    BPD to contain a gateway that has no outgoing flows during
    simulation, therefore preventing the NullPointerException.
    

Temporary fix

Comments

APAR Information

  • APAR number

    JR53122

  • Reported component name

    BPM ADVANCED

  • Reported component ID

    5725C9400

  • Reported release

    800

  • Status

    CLOSED FIN

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2015-04-15

  • Closed date

    2015-07-20

  • Last modified date

    2015-07-20

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

Applicable component levels

  • R856 PSN

       UP

[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSFTN5","label":"IBM Business Process Manager Advanced"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.0","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
16 October 2021