IBM Support

JR52966: BPMCONFIG FAILS WHEN ADDING A NEW NODE TO AN EXISTING DEPLOYMENT ENVIRONMENT

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • When you run BPMConfig -create -de to add a new node with new
    cluster members to your existing IBM Business Process Manager
    (BPM) deployment environment, you get an error similar to the
    following error:
    
    CWMCB0046E: The 'provisionNode' command
    failed:/IBM/BPM8.5/profiles/DmgrProfile/wstemp/anonymous14241825
    51426/workspace/cells/PSCell1/nodes/Node1/servers/SingleClusterM
    ember2/performance-data-warehouse/config/100Custom.xml (No
    such file or directory)
    

Local fix

  • N/A
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:  IBM BPM Advanced                            *
    *                  IBM BPM Standard                            *
    *                  IBM BPM Express                             *
    ****************************************************************
    * PROBLEM DESCRIPTION: When you run BPMConfig -create -de to   *
    *                      add a new node with new cluster         *
    *                      members to your existing IBM Business   *
    *                      Process Manager (BPM) deployment        *
    *                      environment, you get an error similar   *
    *                      to the following error:                 *
    *                      CWMCB0046E: The 'provisionNode'         *
    *                      command                                 *
    *                      failed:/IBM/BPM8.5/profiles/DmgrProfile *
    *                      /wstemp/anonymous1424182551426/workspac *
    *                      e/cells/PSCell1/nodes/Node1/servers/Sin *
    *                      gleClusterMember2/performance-data-     *
    *                      ware                                    *
    *                      house/config/100Custom.xml (No such     *
    *                      file or directory)                      *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    When the deployment environment was created, the 100Custom.xml
    files on the application cluster level for Process Server, and
    on the support cluster level for Performance-data-warehouse
    were not included. These files are used as templates when
    adding new cluster members. Therefore,you receive a
    FileNotFoundException when they are missing during cluster
    member configuration.
    Also, the substitution variables ~SERVER_DESCRIPTION~ (in
    99Local.xml), ~APPSERVER_CELL~ (in 50AppServer.xml), and
    ~TWPERFSERVER_AUTO_SCHEMA_MGMT~ (in 00Static.xml) are not
    resolved correctly.
    

Problem conclusion

  • A fix is available for IBM BPM V.8.5.0.1 that updates the
    BPMConfig command to add the missing 100Custom.xml files and
    substitute the unresolved variables.
    
    On Fix Central (http://www.ibm.com/support/fixcentral), search
    for JR52966:
    1. Select IBM Business Process Manager with your edition from
    the product selector, the installed version to the fix pack
    level, and your platform, and then click Continue.
    2. Select APAR or SPR, enter JR52966, and click Continue.
    
    When you download fix packages, ensure that you also download
    the readme file for each fix. Review each readme file for
    additional installation instructions and information about the
    fix.
    

Temporary fix

Comments

APAR Information

  • APAR number

    JR52966

  • Reported component name

    BPM ADVANCED

  • Reported component ID

    5725C9400

  • Reported release

    855

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2015-03-27

  • Closed date

    2015-04-01

  • Last modified date

    2015-04-01

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    BPM ADVANCED

  • Fixed component ID

    5725C9400

Applicable component levels

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSFTN5","label":"IBM Business Process Manager Advanced"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"855","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
31 August 2023