Fixes are available
Version 8.5 Refresh Pack 5 for the IBM Business Process Manager products
8.5.5: IBM Integration Designer V8.5 Refresh Pack 5 for Windows
8.5.5.0: IBM Integration Designer V8.5 Refresh Pack 5 for Linux
8.0.1.3: IBM Integration Designer V8.0.1 Fix Pack 3 for Linux
8.0.1.3: IBM Integration Designer V8.0.1 Fix Pack 3 for Windows
Version 8.5.0 Fix Pack 2 for the IBM Business Process Manager products
APAR status
Closed as program error.
Error description
After you run the BPMSnapshotCleanup command to remove unnamed snapshots, you can no longer save artifacts in IBM Process Designer in a process app or toolkit that has advanced content. After you run the BPMSnapshotCleanup command to remove unnamed snapshots, you can no longer receive updates in IBM Integration Designer from Process Center when you select "Refresh and Publish" for a project.
Local fix
Edit the LSW_SCA_CONNECTOR table of the BPMDB database and put the value outOfSync in the LAST_SYNCHRONIZED column for the Advanced Integration service that is affected. The existing value is the ID of an unnamed snapshot that has been deleted. Then, in IBM Integration Designer, delete the process app or toolkit from the workspace and reload it by selecting the "Open in workspace" link.
Problem summary
The BPMSnapshotCleanup command removed unnamed snapshots from the database. Advanced Integration services store the ID of an unnamed snapshot in the LSW_SCA_CONNECTOR database table to indicate when the snapshot was last synchronized with its implementation in Integration Designer. Furthermore, this unnamed snapshot ID is stored in your preferences in Integration Designer to indicate when the project was last synchronized with Process Center. Removing the unnamed snapshots from the database causes exceptions to be thrown when Process Designer or Integration Designer attempts to load the unnamed snapshot.
Problem conclusion
A fix is available for Process Designer and Integration Designer in IBM BPM V8.0.1.2 and V8.5.0.1. With the interim fix applied, the Advanced Integration services of unnamed snapshots that have been deleted are marked in Process Designer as being out of sync. In addition, a full comparison of the artifacts (from the tip) instead of a delta comparison (from the last synchronized snapshot) is performed in Integration Designer. On Fix Central (http://www.ibm.com/support/fixcentral), search for JR49848: 1. Select IBM Business Process Manager with your edition from the product selector, the installed version to the fix pack level, and your platform, and then click Continue. 2. Select APAR or SPR, enter JR49848, and click Continue. When you download fix packages, ensure that you also download the readme file for each fix. Review each readme file for additional installation instructions and information about the fix. In addition to this interim fix, install the other interim fixes that are required for the BPMDeleteSnapshot and BPMSnapshotCleanup commands, which are listed in "Issues with BPMDeleteSnapshot and BPMSnapshotCleanup commands in IBM Business Process Manager (BPM)" (http://www.ibm.com/support/docview.wss?uid=swg21669992).
Temporary fix
Comments
APAR Information
APAR number
JR49848
Reported component name
BPM ADVANCED
Reported component ID
5725C9400
Reported release
850
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2014-04-01
Closed date
2014-05-07
Last modified date
2014-05-07
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
BPM ADVANCED
Fixed component ID
5725C9400
Applicable component levels
R751 PSY
UP
R801 PSY
UP
R850 PSY
UP
[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSFTN5","label":"IBM Business Process Manager Advanced"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.5","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
17 October 2021