IBM Support

JR48145: PROCESS PORTAL DOES NOT HANDLE COACH RESIZING PROPERLY ON IPAD

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • Process Portal does not handle resizing of coaches properly on
    an iPad.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:  Users of Process Portal on an iPad, for     *
    *                  BPM Advanced, BPM Standard, or BPM          *
    *                  Express.                                    *
    ****************************************************************
    * PROBLEM DESCRIPTION: In Process Portal, on an iPad, an       *
    *                      increase in the size of the coach       *
    *                      (such as triggered by a change to the   *
    *                      coach contents) results in some areas   *
    *                      of the coach becoming inaccessible.     *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    The iFrame in which a coach is displayed is initially sized
    correctly for the coach, but does not automatically change in
    size when the size of the coach changes, resulting in the
    coach not being correctly displayed thereafter.
    

Problem conclusion

  • Implementing a timer to watch for coach size changes and
    resizing the containing iFrame as needed resolves the issue.
    
    An interim fix for Business Process Manager Version 8.0.1.1 has
    been published to Fix Central.  Please refer to the separate
    file that is automatically downloaded with the interim fix
    for prerequisite information and installation/uninstallation
    instructions.
    

Temporary fix

Comments

APAR Information

  • APAR number

    JR48145

  • Reported component name

    BPM ADVANCED

  • Reported component ID

    5725C9400

  • Reported release

    801

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2013-10-18

  • Closed date

    2013-12-10

  • Last modified date

    2013-12-10

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    BPM ADVANCED

  • Fixed component ID

    5725C9400

Applicable component levels

  • R800 PSY

       UP

[{"Line of Business":{"code":"LOB45","label":"Automation"},"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSFTN5","label":"IBM Business Process Manager Advanced"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.0.1"}]

Document Information

Modified date:
07 October 2021