JR47245: BHVC: BPEL VALIDATION CAUSES APPLICATION INSTALL TO FAIL DUE TO ISSUES WITH THE WSDLMERGER FUNCTIONALITY

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • When installing a Process App or Ear file with BPEL processes,
    it might fail with a message similar to this:
    CWWBV0002E: Validated process model 'MyBPELProcess' with
    findings: 2 errors, 0 warnings, 0 information.
    CWWBV3187E:
    The XSD type definition 'MyInputBO' was not found
    (activity 'Receive', parameter number 1, matching part or
    element 'MyInputType').
    
    This is also a behavioral change in BPM 8.0.1. You would not
    have the same validation errors for your application prior to
    that version.
    
    That error is pretty generic and means that the xsd type
    definition for the named element could not be found in the
    application. For this issue the element would be defined in the
    application but issues with the WSDLMerger function used in
    validation which causes the WSDL interface definition to be
    incorrectly read.
    
    This will occur when you have multiple WSDL files defined with
    the same targetNamespace but different namespaces(xmlns) defined
    for the schema. These will be merged during the validation but
    the xmlns values might become incorrect.
    
    For example you might see the issue if you have two WSDLs with
    a schema tag similar to this pattern.
    
    Interface1.wsdl
    <xsd:schema
     xmlns:NS1="http://namespace1"
     xmlns:NS3="http://namespace3"
     targetNamespace="http://namespace4"
    >
    Interface2.wsdl
    <xsd:schema
     xmlns:NS2="http://namespace2"
     xmlns:NS3="http://namespace3"
     targetNamespace="http://namespace4"
    >
    
    In the artifact loader trace you might see a message similar to
    this which has an incorrect namespace:
    [7/2/13 10:15:48:467 CDT] 00000034 ArtifactLoade 2
    com.ibm.ws.ar.WSDLMerger mergeAttributes(Element, Element, URI)
    Added attribute: xmlns:NS2="http://namespace4"
    

Local fix

  • Manually modify the WSDL files in your application which uses
    the same targetNamespace. Ensure each WSDL file uses the same
    xmlns definitions.
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:  Business Process Manager Advanced users     *
    ****************************************************************
    * PROBLEM DESCRIPTION: Application install failed due to       *
    *                      BPEL validation errors when install     *
    *                      EAR contains BPC into BPM advanced      *
    *                      server.                                 *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    Starting from BPM Advanced V8. Business Process
    Choreographer (BPC) had made some update in BPEL validation
    which used some unimplemented functions for artifact loader
    which results some BPEL validation error. The error related to
    some XSD cannot be found caused by incorrect behavior by the
    WSDL merger which is in turn used by the validator. The net
    effect is that the namespace and prefix may not match after
    merge.
    

Problem conclusion

  • This iFix implements the functions for the WSDL merger and
    correctly merges the namespace and prefixes used in the WSDL.
    
    Install/Dependency information is available in the readme.txt
    on FixCentral. When the user goes to the download files page
    in FixCentral, the readme will be available with the fix
    package as a separate download.
    

Temporary fix

Comments

APAR Information

  • APAR number

    JR47245

  • Reported component name

    BPM ADVANCED

  • Reported component ID

    5725C9400

  • Reported release

    801

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2013-07-16

  • Closed date

    2013-09-25

  • Last modified date

    2013-09-25

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    BPM ADVANCED

  • Fixed component ID

    5725C9400

Applicable component levels

  • R800 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSFTN5","label":"IBM Business Process Manager Advanced"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.0.1","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
07 January 2022