Fixes are available
APAR status
Closed as program error.
Error description
If user try to migrate profile argumented with Monitor to BPM 8.5, it'll fail at the step when do the BPMMigrate. This is caused by no Monitor feature configured in target BPM 8.5 environment. And BPM 8.5 does not support profile argument with Monitor, so this ifix will report related exception during extract phase to warn user.
Local fix
N/A
Problem summary
**************************************************************** * USERS AFFECTED: Business Process Manager V8.5.0.0 users * **************************************************************** * PROBLEM DESCRIPTION: Can not migrate to migrate to BPM * * V8.5.0.0 from previous BPM environment * * that was augmented with IBM Business * * Monitor. * **************************************************************** * RECOMMENDATION: * **************************************************************** Some exception would be thrown during migration to BPM V8.5.0.0 from previous BPM environment that was augmented with IBM Business Monitor.
Problem conclusion
In such kind of migration scenario, a message will be prompted to tell user this migration scenario is not supported. Install/Dependency information is available in the readme.txt on FixCentral. When the user goes to the download files page in FixCentral, the readme will be available with the fix package as a separate download.
Temporary fix
Comments
APAR Information
APAR number
JR46891
Reported component name
BPM ADVANCED
Reported component ID
5725C9400
Reported release
850
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2013-06-08
Closed date
2014-10-29
Last modified date
2014-10-29
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
BPM ADVANCED
Fixed component ID
5725C9400
Applicable component levels
R800 PSY
UP
[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSFTN5","label":"IBM Business Process Manager Advanced"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.5","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
12 October 2021