IBM Support

JR46250: NO ERROR DETAILS AVAILABLE WHEN PROCESS INSTANCE FAILS TO RESUME AFTER INFLIGHT MIGRATION

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • Consider a process instance that is currently executing an
    activity,
    called step A. The process instance is then migrated to another
    snapshot, where the current execution step (step A) is not
    present.
    After the process instance has been resumed the process instance
    fails
    as expected. However, when you try to investigate on the error,
    e.g. in
    process designer, no error details are available.
    

Local fix

  • N/A
    

Problem summary

  • Problem Description:
    Consider a process instance that is currently executing an
    activity, called step A.
    The process instance is then migrated to another snapshot, where
    the current execution step (step A) is not present.
    After the process instance has been resumed the process instance
    fails as expected.
    However, when you try to investigate on the error, e.g. in
    process designer, no error details are available.
    

Problem conclusion

  • This fix creates a more descriptive error message
    
    FIX AVAILABILITY:
    iFix for 7.5.1.1 is available on Fix Central, search for APAR
    JR46250 at http://www.ibm.com/support/fixcentral/
    
    Fix is also targetted for inclusion in next fixpack for BPM
    V7.5.1
    
    When obtaining any of the above fixes, be sure to download the
    accompanying readme, for itself and any prerequisite fixes, and
    review them thorougly
    

Temporary fix

Comments

APAR Information

  • APAR number

    JR46250

  • Reported component name

    BPM ADVANCED

  • Reported component ID

    5725C9400

  • Reported release

    751

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2013-04-08

  • Closed date

    2013-07-11

  • Last modified date

    2013-07-11

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    BPM ADVANCED

  • Fixed component ID

    5725C9400

Applicable component levels

  • R751 PSY

       UP

[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSFTN5","label":"IBM Business Process Manager Advanced"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"7.5.1","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
11 October 2021