APAR status
Closed as program error.
Error description
If there is a group defined with the same name as a value of a user attribute, the user task assignment in Process Inspector of the Process Designer ignores the Participant Groups in the routing condition of the task and all users with user attributes set as defined in the routing condition can see and claim the task, the Participant Group definition is completely ignored. The routing condition for the user task assignment is also ignored for email notifications, if enabled.
Local fix
Problem summary
If a user task assignment is done via routing conditions, and the routing condition contains a user attribute and there exists a group that has the same name as the user attribute, the members of this group might incidently be added to the routing condition's result. This issue can be seen in the process inspector of process designer.
Problem conclusion
With this fix, the algorithm to calculate the routing condition result will correctly distinguish between user attribute values and group names.
Temporary fix
Not applicable
Comments
APAR Information
APAR number
JR45845
Reported component name
BPM ADVANCED
Reported component ID
5725C9400
Reported release
801
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2013-02-25
Closed date
2015-02-06
Last modified date
2015-02-06
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
BPM ADVANCED
Fixed component ID
5725C9400
Applicable component levels
R801 PSN
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSFTN5","label":"IBM Business Process Manager Advanced"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.0.1","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
08 January 2022