Skip to main content

JR45336: "RE-REGISTRATION OF THE MESSAGE RECOVERY THREAD ONLY IF SETTINGS HAVE CHANGED"


Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • "re-registration of the message recovery thread only if settings
    have changed"
    .
    "Currently, every time a Process Server application target JVM
    is re-)started, a re-registration of the Work Manager message
    recovery thread with the BPEScheduler happens (CScopeProvidedBea
    n.reRegisterCleanup()). This requires the cancellation and re-
    creation of a scheduler entry through scheduler APIs. In a dis-
    tributed platform high availability environment or on a multi-
    servant setup on zOS re-registrations can happen multiple
    times (redundantly), due to the number of JVM starts.
    However, generally the re-registration is only required, if the
    configuration settings for th recovery thread have changed.
    have changed. The fix will introduce this conditional re-
    registration, thus greatly reducing the number of re-
    registrations."
    

Local fix

Problem summary

  • Problem Description:
    When using WorkManager based navigation, on server restart in a
    clustered environment, the following assertion
    may be observed in SystemOut.log:
    
     Assertion violation !(Cannot schedule Message Cleanup) in
    method >>
    com.ibm.bpe.framework.navigation.CScopeProviderBean.reRegisterCl
    eanup(CScopeProviderBean.java:198)
    
    Problem Summary:
    Currently, each time a Process Server application target
    JVM is (re-)started, a re-registration of the Work Manager
    message
    recovery thread with the BPEScheduler happens
    (CScopeProviderBean.reRegisterCleanup()). This requires the
    cancellation
    and re-creation of a scheduler entry through scheduler APIs. In
    a
    distributed platform high availability environment
    re-registrations can happen multiple times (redundantly),
    due to the number of JVM starts. Under unfavorable
    circumstances, this can lead to deadlocks and unavailability of
    the Scheduler.
    
    Problem Conclusion:
    
    Re-registration is only required, if the configuration settings
    for the recovery thread
    have changed. The fix will introduce this conditional
    re-registration,
    thus greatly reducing the number of re-registrations."
    

Problem conclusion

  • Problem will be fixed with V7512
    

Temporary fix

Comments

APAR Information

  • APAR number

    JR45336

  • Reported component name

    BPM ADVANCED

  • Reported component ID

    5725C9400

  • Reported release

    751

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2013-01-09

  • Closed date

    2013-02-18

  • Last modified date

    2013-02-18

  • APAR is sysrouted FROM one or more of the following:

    IV31569

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    BPM ADVANCED

  • Fixed component ID

    5725C9400

Applicable component levels

  • R751 PSY

       UP

Rate this page:

(0 users)Average rating

Copyright and trademark information

IBM, the IBM logo and ibm.com are trademarks of International Business Machines Corp., registered in many jurisdictions worldwide. Other product and service names might be trademarks of IBM or other companies. A current list of IBM trademarks is available on the Web at "Copyright and trademark information" at www.ibm.com/legal/copytrade.shtml.

Rate this page:


(0 users)Average rating

Add comments

Document information

IBM Business Process Manager Advanced


Software version:
7.5.1


Reference #:
JR45336


Modified date:
2013-02-18

Translate my page

Content navigation