IBM Support

JR45287: AIS IS NOT BEING RUN AS A SYSTEM TASK IN CERTAIN SCENARIOS

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • Customer have a toolkit that has some advanced integration
    services. This toolkit is used in a process application. When
    the AIS is called, user have to manually run the task in the
    inspector view to be able to run the AIS.
    
    Reproduction steps :
    1-Create a toolkit
    2-Create an AIS with any input and output
    3-Open the toolkit in the integration designer
    4- Implement a dummy implementation for the AIS
    5-Refresh and publish the implementation
    6-Create a BPD that call the AIS
    7-Play manually the AIS in the inspector
    

Local fix

Problem summary

  • If an Advanced Integration Service (AIS) is defined within a
    toolkit, but the BPD that uses this AIS resides in a process
    application that references this toolkit, the invocation of
    the AIS might not happen automatically.
    A user needs to start the AIS manually via portal or similar
    capabilities.
    

Problem conclusion

  • To determine if the AIS needs to be emulated, the process
    application's context was used to introspect the AIS.
    
    This fix now uses the right context - the toolkit context of the
    AIS - to introspect the AIS. Therefore, automatic execution of
    an AIS can always work.
    
    Problem fixed. IFix available on top of BPM 7.5.1.1
    Fix targeted for inclusion in next fixpack BPM 7.5.1.2
    

Temporary fix

Comments

APAR Information

  • APAR number

    JR45287

  • Reported component name

    BPM ADVANCED

  • Reported component ID

    5725C9400

  • Reported release

    751

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2013-01-04

  • Closed date

    2013-03-25

  • Last modified date

    2013-03-25

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    BPM ADVANCED

  • Fixed component ID

    5725C9400

Applicable component levels

  • R751 PSY

       UP

[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSFTN5","label":"IBM Business Process Manager Advanced"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"7.5.1","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
12 October 2021