JR44757: ORACLE CONNECTOR BULK LOAD JOB ABENDS DURING JOB TERMINATION

Subscribe

You can track all active APARs for this component.

APAR status

  • Closed as program error.

Error description

  • After performing Bulk Load, PX Bridge has an abend during
    termination of the job.  The data is written OK.
    This is VERY SIMILAR to JR42227.
    

Local fix

Problem summary

  • Oracle Connector bulk load job abends during job termination.
    After performing Bulk Load, PX Bridge has an abend during
    termination of the job.  The data is written OK.
    This is similar to JR42227.
    

Problem conclusion

  • A method in Oracle Connector connection code, assumes that
    the job is a regular target and not a Bulk Load and resets
    the uncommitted array count.  But there is no array count
    to reset when bulk loading.  When we reset the uncommitted
    array count, we are actually nulling part of another
    connection object and thus the problem.
    

Temporary fix

Comments

APAR Information

  • APAR number

    JR44757

  • Reported component name

    WIS QUALITYSTAG

  • Reported component ID

    5724Q36QS

  • Reported release

    810

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2012-11-14

  • Closed date

    2012-11-26

  • Last modified date

    2012-11-26

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    WIS QUALITYSTAG

  • Fixed component ID

    5724Q36QS

Applicable component levels

  • R810 PSY

       UP

  • R850 PSY

       UP

  • R870 PSY

       UP

  • R910 PSY

       UP



Rate this page:

(0 users)Average rating

Document information


More support for:

InfoSphere QualityStage

Software version:

8.1

Reference #:

JR44757

Modified date:

2012-11-26

Translate my page

Machine Translation

Content navigation