APAR status
Closed as program error.
Error description
After performing Bulk Load, PX Bridge has an abend during termination of the job. The data is written OK. This is VERY SIMILAR to JR42227.
Local fix
Problem summary
Oracle Connector bulk load job abends during job termination. After performing Bulk Load, PX Bridge has an abend during termination of the job. The data is written OK. This is similar to JR42227.
Problem conclusion
A method in Oracle Connector connection code, assumes that the job is a regular target and not a Bulk Load and resets the uncommitted array count. But there is no array count to reset when bulk loading. When we reset the uncommitted array count, we are actually nulling part of another connection object and thus the problem.
Temporary fix
Comments
APAR Information
APAR number
JR44757
Reported component name
WIS QUALITYSTAG
Reported component ID
5724Q36QS
Reported release
810
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2012-11-14
Closed date
2012-11-26
Last modified date
2012-11-26
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
WIS QUALITYSTAG
Fixed component ID
5724Q36QS
Applicable component levels
R810 PSY
UP
R850 PSY
UP
R870 PSY
UP
R910 PSY
UP
Rate this page:
Average rating
Copyright and trademark information
IBM, the IBM logo and ibm.com are trademarks of International Business Machines Corp., registered in many jurisdictions worldwide. Other product and service names might be trademarks of IBM or other companies. A current list of IBM trademarks is available on the Web at "Copyright and trademark information" at www.ibm.com/legal/copytrade.shtml.