IBM Support

JR41195: WITH DMGR ON WINDOWS AND NODES ON MIXED OS, CONFIGURING PROCESS MANAGER CAUSES ACCESS PROBLEMS

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • On the Network Deployment Environment, If the Deployment Manager
    is installed on Windows operating system and the nodes are on
    mixed operating systems, then configuring Business Procss
    Manager on those nodes will cause access problems with the
    Process Center, Process Administration Console and Process
    Portal Applocations
    
    Symptoms:
    You will see the status of IBM_BPM_Teamworks application as not
    started on a server or a cluster member that is configured on
    the non Windows operating system. You will also see the
    following errors on the particular server or cluster member's
    system out:
    UTLS0002E: The shared library
    IBM_BPM_Process_Server_Shared_Library contains a classpath entry
    which does not resolve to a valid jar file, ....
    UTLS0002E: The shared library
    IBM_BPM_PerformanceDW_Shared_Library contains a classpath entry
    which does not resolve to a valid jar file, ....
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:  users of IBM BPM Teamworks applications     *
    ****************************************************************
    * PROBLEM DESCRIPTION: When dmgr on Windows and nodes on       *
    *                      mixes OS process manager conguration    *
    *                      experiences access problems             *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    On Network Deployment Environments with the deployment manager
    on Windows and the other nodes are on mixed operating systems,
    then configuring Business Procss Manager on those nodes will
    cause access problems with the Process Center, Process
    Administration Console and Process Portal Applocations
    

Problem conclusion

  • Correct the possiblility of access errors during BPM
    configuration when DM running in Windows and other node in
    mixed environments.
    

Temporary fix

Comments

APAR Information

  • APAR number

    JR41195

  • Reported component name

    BPM ADVANCED

  • Reported component ID

    5725C9400

  • Reported release

    751

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2011-11-11

  • Closed date

    2012-01-11

  • Last modified date

    2012-01-11

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    BPM ADVANCED

  • Fixed component ID

    5725C9400

Applicable component levels

  • R750 PSY

       UP

[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSFTN5","label":"IBM Business Process Manager Advanced"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"7.5.1","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
12 October 2021