  • Closed as program error.

Error description

  • If there is a revised PO with one PO line which is partially
    received, there is an error in calculating PO line loaded cost
    and tax value when changing PO line quantity. Reason for this
    is because MAXIMO will not allow for quantity to go below the
    received quantity. However, MAXIMO will calculate loaded cost
    and tax before checking that quantity is greater than received
    quantity. Hence, if quantity entered by the user is below
    received quantity, MAXIMO will throw an error, but after tax
    and loaded cost have already been changed. After error is
    thrown, the line cost and quantity are reverted back, but
    loaded and tax cost will remain with incorrect values.
    
    Reproduction Steps:
    Step 1: Create new PO
    Step 2: Create one Service line. Issue is also observer with
    other line types.
    Step 3: Approve PO
    Step 4: Go to Receiving application and receive services for a
    quantity of 70
    Step 5: Save Service receipt
    Step 6: Go to the PO and revise PO
    Step 7: Put remark for new revision
    Step 8: Open PO line on the revised PO and enter quantity of 50
    Step 9: After entering quantity of 50 you will get error message
    Step 10: Tax and Loaded Cost are left with incorrect values,
    althrough quantity and line cost are reverted the the initial
    values.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Maximo Users on 7509                                         *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * If there is a revised PO with one PO line which is partially *
    * received, there is an error in calculating PO line loaded    *
    * cost and tax value when changing PO line quantity. Reason    *
    * for this is because MAXIMO will not allow for  quantity to   *
    * go below the received quantity. However, MAXIMO will         *
    * calculate loaded cost and tax before checking that quantity  *
    * is greater than received quantity. Hence, if quantity        *
    * entered by the user is below received quantity, MAXIMO will  *
    * throw an error, but after tax and loaded cost have already   *
    * been changed. After error is thrown, the line cost and       *
    * quantity are reverted back, but loaded and tax cost will     *
    * remain with incorrect values.                                *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Install latest Release 7.5.0.9 of Base Services              *
    ****************************************************************
    

Problem conclusion

  • The fix for this APAR is contained in the following maintenance
    package:
    Release 7.5.0.9 of Base Services
    

Temporary fix

Comments

APAR Information

  • APAR number

    IV71189

  • Reported component name

    MAXIMO ASST MGM

  • Reported component ID

    5724R46AM

  • Reported release

    750

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2015-03-18

  • Closed date

    2015-06-01

  • Last modified date

    2015-06-01

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • MAXIMO
    

Fix information

  • Fixed component name

    MAXIMO ASST MGM

  • Fixed component ID

    5724R46AM

Applicable component levels

  • R750 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSLKT6","label":"IBM Maximo Asset Management"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"750","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
01 June 2015