Closed as program error.
Error description
I met with one of the Scheduler Product Architects who said I should enter this APAR. In WOTrack if you un-assign an Assignment (by clearing the Labor field) it also clears out the Scheduled Start date field. This makes sense as the Assignment is no longer scheduled so it should not have a date. In Graphical Assignment when you un-assign an Assignment by dragging it's green bar from the Labor name row up to the Craft row so it turns orange again, the Scheduled Start date is not cleared. You can see this by going to the Assignments tab in WOTrack and even though the Labor field is empty the Scheduled Start date is not empty. This causes problems in GA as the Assignment can now be at a different date than it's WO. Steps to Reproduce: 1. Create a new WO with a Duration of 8 and give it any Craft for a Planned Labor row on the Plans tab. Save. Check the Assignment row on the Assignments tab to see that the Assignment's Scheduled Start date is empty. 2. Go to the Calendars application and extend the Finish of the Day calendar to the end of the year if necessary. Save. If you had to extend the Finish, you must now use the Select Action menu picking Define/Apply Shifts. Check the box in front of DAY and click on Apply Shifts. Apply it to the full calendar and click OK. 3. Go to the Labor application and make sure at least one of the Labors belonging to the Craft in Step 1 is on the Day Calendar and Day Shift. 4. Go to GA and create a new Work List. 5. Give it Day Calendar and Day Shift. 6. In the Work Queries Section add a New Row and give it a where condition to pick the WO created in Step 1, such as: wonum = 'the wonum" 7. Save. 8. Click on the Gantt View tab. 9. If the Resource section at the bottom is grey and a message says to click a tab, click on the Resource Schedule tab to see the Crafts and the Labor codes. 10, You will see the Assignment created in Step 1 as an orange colored bar on the same row as the Craft. 11. Put the mouse cursor on the orange bar and press and hold the left mouse button. 12. Drag it down to the one of the Labor rows and release the mouse button. The bar will now be green. If you go to WOTrack you will see that the Labor and the Scheduled Start Date fields are now filled in on the Assignments tab. 13. Now put the cursor back on the green bar and drag it back up to the Craft row and release it. It will turn back to orange, the color it is when not assigned. Look at the Assignments tab in WOTrack and you will see that while the Labor field has been cleared, the Scheduled start date has not been cleared. This is the problem. With it populated like this you can move the WO's dates in Scheduler but back in GA it is the Assignment's date that matters and it is stuck on the old meaningless date, not the date you decided on when you moved it in the Scheduler.
Local fix
(none)
Problem summary
**************************************************************** * USERS AFFECTED: * * Maximo Users on 7509 or using a specific application * **************************************************************** * PROBLEM DESCRIPTION: * * In WOTrack if you un-assign an Assignment (by clearing the * * Labor field) it also clears out the Scheduled Start date * * field. * * This makes sense as the Assignment is no longer scheduled so * * it should not have a date. * **************************************************************** * RECOMMENDATION: * * Intall latest Release 7.5.0.9 of Base Services * ****************************************************************
Problem conclusion
Fix has been made to fix the issue. The fix for this APAR is contained in the following maintenance package: Release 7.5.0.9 of Base Services
Temporary fix
Comments
APAR Information
APAR number
IV70964
Reported component name
MAXIMO SCHEDULE
Reported component ID
5724R46SE
Reported release
751
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2015-03-12
Closed date
2015-08-11
Last modified date
2015-08-11
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Modules/Macros
MAXIMO
Fix information
Fixed component name
MAXIMO SCHEDULE
Fixed component ID
5724R46SE
Applicable component levels
R750 PSY
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"751","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
11 August 2015