IV70964: ASSIGNMENT SCHEDULED START DATE IS NOT CLEARED WHEN YOU UNASSIGN AN ASSIGNMENT IN GRAPHICAL ASSIGNMENT.

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • I met with one of the Scheduler Product Architects who said I
    should enter this APAR.
    
    In WOTrack if you un-assign an Assignment (by clearing the
    Labor field) it also clears out the Scheduled Start date field.
     This makes sense as the Assignment is no longer scheduled so
    it should not have a date.
    
    In Graphical Assignment when you un-assign an Assignment by
    dragging it's green bar from the Labor name row up to the Craft
    row so it turns orange again, the Scheduled Start date is not
    cleared.   You can see this by going to the Assignments tab in
    WOTrack and even though the Labor field is empty the Scheduled
    Start date is not empty.
    
    This causes problems in GA as the Assignment can now be at a
    different date than it's WO.
    
    Steps to Reproduce:
    1. Create a new WO with a Duration of 8 and give it any Craft
    for a Planned Labor row on the Plans tab.   Save.   Check the
    Assignment row on the Assignments tab to see that the
    Assignment's Scheduled Start date is empty.
    2. Go to the Calendars application and extend the Finish of the
    Day calendar to the end of the year if necessary.   Save.   If
    you had to extend the Finish, you must now use the Select
    Action menu picking Define/Apply Shifts.   Check the box in
    front of DAY and click on Apply Shifts.  Apply it to the full
    calendar and click OK.
    3. Go to the Labor application and make sure at least one of
    the Labors belonging to the Craft in Step 1 is on the Day
    Calendar and Day Shift.
    4. Go to GA and create a new Work List.
    5. Give it Day Calendar and Day Shift.
    6. In the Work Queries Section add a New Row and give it a
    where condition to pick the WO created in Step 1, such as:
      wonum = 'the wonum"
    7. Save.
    8. Click on the Gantt View tab.
    9. If the Resource section at the bottom is grey and a message
    says to click a tab, click on the Resource Schedule tab to see
    the Crafts and the Labor codes.
    10,  You will see the Assignment created in Step 1 as an orange
    colored bar on the same row as the Craft.
    11. Put the mouse cursor on the orange bar and press and hold
    the left mouse button.
    12. Drag it down to the one of the Labor rows and release the
    mouse button.   The bar will now be green.   If you go to
    WOTrack you will see that the Labor and the Scheduled Start
    Date fields are now filled in on the Assignments tab.
    13. Now put the cursor back on the green bar and drag it back
    up to the Craft row and release it.   It will turn back to
    orange, the color it is when not assigned.
    
    Look at the Assignments tab in WOTrack and you will see that
    while the Labor field has been cleared, the Scheduled start
    date has not been cleared.    This is the problem.   With it
    populated like this you can move the WO's dates in Scheduler
    but back in GA it is the Assignment's date that matters and it
    is stuck on the old meaningless date, not the date you decided
    on when you moved it in the Scheduler.
    

Local fix

  • (none)
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Maximo Users on 7509 or using a specific application         *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * In WOTrack if you un-assign an Assignment (by clearing the   *
    * Labor field) it also clears out the Scheduled Start date     *
    * field.                                                       *
    * This makes sense as the Assignment is no longer scheduled so *
    * it should not have a date.                                   *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Intall latest Release 7.5.0.9 of Base Services               *
    ****************************************************************
    

Problem conclusion

  • Fix has been made to fix the issue. The fix for this APAR is
    contained in the following maintenance package: Release 7.5.0.9
    of Base Services
    

Temporary fix

Comments

APAR Information

  • APAR number

    IV70964

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    751

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2015-03-12

  • Closed date

    2015-08-11

  • Last modified date

    2015-08-11

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • MAXIMO
    

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

  • R750 PSY

       UP

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"751","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]