IBM Support

IV68600: JOBSTREAM STATUS SHOWS READY IF THE JOBSTREAM SUCCEEDED AT FTA WHILE STOPPING MDM.

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • When the jobstream succeeded in FTA while stopping MDM, the
    status of jobstream shows READY in TDWC after MDM is started.
    
    Here is step to reproduce:
    ------------------------------------
    1. Submit a jobstream with AT option which is executed in a
    FTA.
       i.e. comnan "sbs FTA#jobstream;ali=jobstream1;at=XXXX"
    2. Confirm that the jobstream exists in TDWC, and the status is
    HOLD.
    3. Stop MDM (conman "stop;wait")
    4. Wait until the submitted jobstream is finished in FTA.
       Confirm that the status of the jobstream changed into SUCC
    by conman ss command in FTA.
    5. Start MDM (conman start)
    6. Reflesh TDWC, the status of jobstream chenged into READY
    (But it should be SUCC).
    7. Run "planman resync", the status of the jobstream changed
    into SUCC in TDWC.
    

Local fix

  • Run "planman resync"
    

Problem summary

  • When the jobstream succeeded in FTA while stopping MDM, the
    status of jobstream shows READY in TDWC after MDM is started.
    
    Here is step to reproduce:
    ------------------------------------
    1. Submit a jobstream with AT option which is executed in a
    FTA.
       i.e. comnan "sbs FTA#jobstream;ali=jobstream1;at=XXXX"
    2. Confirm that the jobstream exists in TDWC, and the status is
    HOLD.
    3. Stop MDM (conman "stop;wait")
    4. Wait until the submitted jobstream is finished in FTA.
       Confirm that the status of the jobstream changed into SUCC
    by conman ss command in FTA.
    5. Start MDM (conman start)
    6. Reflesh TDWC, the status of jobstream chenged into READY
    (But it should be SUCC).
    7. Run "planman resync", the status of the jobstream changed
    into SUCC in TDWC.
    

Problem conclusion

  • This apar will be fixed   9.1.0-TIV-TWS-FP0003 and
    9.2.0-TIV-TWS-FP0002
    

Temporary fix

  • run planman resync
    

Comments

APAR Information

  • APAR number

    IV68600

  • Reported component name

    TIV WKLD SCHDL

  • Reported component ID

    5698WKB91

  • Reported release

    9A1

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2015-01-15

  • Closed date

    2015-04-13

  • Last modified date

    2015-04-13

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    TIV WKLD SCHDL

  • Fixed component ID

    5698WKB91

Applicable component levels

  • R9A1 PSY

       UP

[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSGSPN","label":"IBM Workload Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"9A1","Edition":"","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
13 April 2015