APAR status
Closed as program error.
Error description
The MDM is in Brazil using TZ=America/Sao_Paulo, this FTA is in Chile, after start DST (in Chile) all jobs are showing and running in incorrect time. JobStream configured to start at 00:10hs Chile time, but is running at 01:10:09. Conman is working fine, but the DWC is doing a wrong calculation of TZ (it seems that is using GMT).
Local fix
N/A
Problem summary
The MDM is in Brazil using TZ=America/Sao_Paulo, this FTA is in Chile, after start DST (in Chile) all jobs are showing and running in incorrect time. JobStream configured to start at 00:10hs Chile time, but is running at 01:10:09. Conman is working fine, but the DWC is doing a wrong calculation of TZ (it seems that is using GMT).
Problem conclusion
This apar will be fixed 8.6.0-TIV-TWS-FP0004, 9.1.0-TIV-TWS-FP0002, 9.2.0-TIV-TWS-FP0002
Temporary fix
N/A
Comments
APAR Information
APAR number
IV68122
Reported component name
TIV WKLD SCHDL
Reported component ID
5698WKB91
Reported release
9S1
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2014-12-23
Closed date
2015-02-19
Last modified date
2015-02-19
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
TIV WKLD SCHDL
Fixed component ID
5698WKB91
Applicable component levels
R9S1 PSY
UP
[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSGSPN","label":"IBM Workload Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"9S1","Edition":"","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
19 February 2015