APAR status
Closed as program error.
Error description
If a message flow thread processing a message received through an HTTP Input node is terminated without sending an HTTP reply from the same thread, and the message being processed this way times out, the HTTP Input node may fail to correctly recall the HTTP message stored earlier for use during the timeout, potentially leading to unexplained CPU activity inhibiting shutdown and correct timeout processing. Additional Symptom(s) Search Keyword(s):
Local fix
NA
Problem summary
**************************************************************** USERS AFFECTED: <span style="font-family:courier new,courier,monospace"><span style="font-size:14px">IBM App Connect Enterprise V11 users with http flows. </span></span> Platforms affected: MultiPlatform **************************************************************** PROBLEM DESCRIPTION: <span style="font-size:14px"><span style="font-family:courier new,courier,monospace"><span style="background-color:rgb(255, 255, 255);color:rgb(0, 0, 0)">If a message flow thread processing a message received through </span><span style="background-color:rgb(255, 255, 255);color:rgb(0, 0, 0)">an HTTP Input node is terminated without sending an HTTP reply </span><span style="background-color:rgb(255, 255, 255);color:rgb(0, 0, 0)">from the same thread, and the message being processed this way </span><span style="background-color:rgb(255, 255, 255);color:rgb(0, 0, 0)">times out, the HTTP Input node may fail to correctly recall the </span><span style="background-color:rgb(255, 255, 255);color:rgb(0, 0, 0)">HTTP message stored earlier for use during the timeout, </span><span style="background-color:rgb(255, 255, 255);color:rgb(0, 0, 0)">potentially leading to unexplained CPU activity inhibiting </span><span style="background-color:rgb(255, 255, 255);color:rgb(0, 0, 0)">shutdown and correct timeout processing. Thread stack taken at the time of failure will show below calls in the stack:</span></span></span> <p style="margin-left:0px">ImbStringBase::assignInternal</p><p style="margin-left:0px">Imb::EvHtp::request::getOriginalMsgAsBlo b ImbWSInputNode::MessageLoopContext::handleSingleMessage</p><p style="margin-left:0px">ImbWSInputNode::readQueue</p>
Problem conclusion
<span style="font-size:14px"><span style="font-family:courier new,courier,monospace"><span style="background-color:rgb(248, 248, 248);color:rgb(29, 28, 29)">The product no longer fails and cause a hang when http timeout occurres</span></span></span> --------------------------------------------------------------- The fix is targeted for delivery in the following PTFs: Version Maintenance Level v11.0 11.0.0.9 The latest available maintenance can be obtained from: http://www-01.ibm.com/support/docview.wss?rs=849&uid=swg27006041 If the maintenance level is not yet available,information on its planned availability can be found on: http://www-1.ibm.com/support/docview.wss?rs=849&uid=swg27006308 ---------------------------------------------------------------
Temporary fix
Comments
APAR Information
APAR number
IT32695
Reported component name
APP CONNECT ENT
Reported component ID
5724J0550
Reported release
B00
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2020-04-29
Closed date
2020-06-03
Last modified date
2020-06-03
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
APP CONNECT ENT
Fixed component ID
5724J0550
Applicable component levels
RB00 PSY
UP
[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSDR5J","label":"IBM App Connect Enterprise"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"B00","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
12 June 2020