IBM Support

IT29959: DELAY IN CLA2 STEP AFTER UPGRADING TO V5.2.6.3_10

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • The CLA2 step has a 5 second delay after upgrading to
    v5.2.6.3_10.
    This APAR is created to report the regression in APAR IT25978.
    

Local fix

  • RTC: 586114
    

Problem summary

  • USERS AFFECTED:
    ALL
    
    PROBLEM DESCRIPTION:
    The CLA2 step has a 5 second delay after upgrading to
    v5.2.6.3_10.
    
    
    PLATFORMS AFFECTED:
    ALL
    

Problem conclusion

  • RESOLUTION SUMMARY:
    
    A code fix is provided.
    
    
    DELIVERED IN:
    5020603_11
    

Temporary fix

Comments

APAR Information

  • APAR number

    IT29959

  • Reported component name

    STR B2B INTEGRA

  • Reported component ID

    5725D0600

  • Reported release

    526

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2019-08-21

  • Closed date

    2019-08-28

  • Last modified date

    2019-09-03

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    STR B2B INTEGRA

  • Fixed component ID

    5725D0600

Applicable component levels

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS3JSW","label":"IBM Sterling B2B Integrator"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"5.2.6","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
03 September 2019