Direct links to fixes
APAR status
Closed as program error.
Error description
ICC IBM Sterling B2B Integrator data retrieval is significantly slower (6 times) with XPATH specified in ICC for BP monitoring, compared to no XPATH. The majority of the processing time is in IBM Sterling B2B Integrator when XPATH is used in ICC. This can be a IBM Sterling B2B Integrator performance issue.
Local fix
STRRTC - 556487 LB / LB Circumvention: None
Problem summary
Users Affected: All Problem Description: The data retrieval is significantly slower (6 times) with XPATH specified in ICC for BP monitoring. Platforms Affected: All
Problem conclusion
Resolution Summary: A code fix is provided. Delivered In: 5020602_6 5020603_6
Temporary fix
Comments
APAR Information
APAR number
IT23643
Reported component name
STR B2B INTEGRA
Reported component ID
5725D0600
Reported release
526
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2018-01-05
Closed date
2018-05-28
Last modified date
2018-07-15
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
STR B2B INTEGRA
Fixed component ID
5725D0600
Applicable component levels
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS3JSW","label":"IBM Sterling B2B Integrator"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"5.2.6","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
15 July 2018