IBM Support

IT21850: OUT-OF-MEMORY ERROR NOTICED DURING LONGEVITY TEST FOR GLOBAL MAILBOX V1.0.0.3

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • While running a longevity test for a period of more than two
    weeks, it is noticed that Global Mailbox UI node goes
    out-of-memory.
    
    [IBM Sterling B2B Integrator V5.2.6.3 (with Global Mailbox); GM
    V1.0.0.3] --> for the OOM 541510 issue.
    

Local fix

  • STRRTC - 541510
    KG / KG
    Circumvention: None
    

Problem summary

  • Users Affected:
    Users using IBM Sterling B2B Integrator V5.2.6.3 with Global
    Mailbox.
    
    Problem Description:
    Out-Of-Memory error noticed on Global Mailbox UI node during
    longevity tests.
    
    Platforms Affected:
    All
    

Problem conclusion

  • Resolution Summary:
    A code fix is provided.
    
    Delivered In:
    5020603_2B
    

Temporary fix

Comments

APAR Information

  • APAR number

    IT21850

  • Reported component name

    STR B2B INTEGRA

  • Reported component ID

    5725D0600

  • Reported release

    526

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2017-08-04

  • Closed date

    2017-08-04

  • Last modified date

    2017-08-04

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    STR B2B INTEGRA

  • Fixed component ID

    5725D0600

Applicable component levels

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS3JSW","label":"Sterling B2B Integrator"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"5.2.6","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
11 September 2023