APAR status
Closed as program error.
Error description
Swift 2016 Update takes a very long time during IBM Sterling B2B Integrator V5262_3 installation.
Local fix
Problem summary
USERS AFFECTED: ALL PROBLEM DESCRIPTION: Swift 2016 Update takes a very long time during installation, removing this component from the ifix to speed up the process. PLATFORMS AFFECTED: ALL
Problem conclusion
RESOLUTION SUMMARY: A code fix is provided. SWIFT 2016 component jar has been removed from the Ifix and separately hosted onto Fix Central. Customer who needs SWIFT 2016 updates will have to download this from fix central and install using InstallSerice.sh script FIX ID (in fix central): 5.2.6.2-OtherSoftware-B2Bi-SFG-SWIFT_2016_UPDATES DELIVERED IN: 5020602_5 5020603_3
Temporary fix
Comments
APAR Information
APAR number
IT21076
Reported component name
STR B2B INTEGRA
Reported component ID
5725D0600
Reported release
526
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2017-06-23
Closed date
2017-09-11
Last modified date
2017-11-15
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
STR B2B INTEGRA
Fixed component ID
5725D0600
Applicable component levels
R526 PSY
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS3JSW","label":"IBM Sterling B2B Integrator"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"5.2.6","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
15 November 2017