IBM Support

IT19638: INTERNAL EVENT IS TRIGGERING THE BUSINESS PROCESS TWICE FOR FILETRANSFER FAILURE FOR SBI VERSION 5020601

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • Internal Event is triggering the Business Process twice for File
    transfer
    failure in SBI 5020601 with the following configuration.
    
    
    Customer_Overrides.properties file :
    
    listenerStartup.Listener.Class.26=com.sterlingcommerce.woodstock
    .dmi.visibility.event.XpathBPLauncherEventListener
    dmivisibility.bp_event_trigger.1=Aft.Visibility.CommFileXferComp
    lete.1,/Event/isSuccessful='true',HelloWorld,admin
    dmivisibility.bp_event_trigger.2=Aft.Visibility.CommFileXferComp
    lete.1,/Event/isSuccessful='false',EmailNotification,admin
    

Local fix

  • STRRTC - 524171
    RG / RG
    Circumvention: None
    

Problem summary

  • Problem Description:
    Internal  Event is triggering the BP twice for File transfer
    failure.
    When we set below properties
    istenerStartup.Listener.Class.26=com.sterlingcommerce.woodstock.
    dmi.visibility.event.XpathBPLauncherEventListener
    dmivisibility.bp_event_trigger.1=Aft.Visibility.CommFileXferComp
    lete.1,/Event/isSuccessful='true',HelloWorld,admin
    dmivisibility.bp_event_trigger.2=Aft.Visibility.CommFileXferComp
    lete.1,/Event/isSuccessful='false',EmailNotification,admin
    
    1. Add the above properties in customer_overrides.properties
    file and restart the server.
    2. Configure a FTP Server Adapter.
    3. Connect to the FTP Server using FileZilla or Command Line or
    any client and transfer a file. Do one successful transfer and
    for second one terminate the connection during the file transfer
    (for unsuccessful file transfer test)
    4. Go to current processes and check whether BPs are triggered
    or not.
    5. for failure File transfer, each time EmailNotification BP is
    triggering twice. Please check the attached word document. This
    is happening with Linux only.
    
    
    Found In:
    All builds above 5020600 onwards
    

Problem conclusion

  • Resolution Summary:
    A code fix is provided.
    
    Delivered In:
    5020603_7
    

Temporary fix

Comments

APAR Information

  • APAR number

    IT19638

  • Reported component name

    STR B2B INTEGRA

  • Reported component ID

    5725D0600

  • Reported release

    526

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2017-03-16

  • Closed date

    2018-10-15

  • Last modified date

    2018-10-15

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    STR B2B INTEGRA

  • Fixed component ID

    5725D0600

Applicable component levels

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS3JSW","label":"IBM Sterling B2B Integrator"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"5.2.6","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
15 October 2018