Direct links to fixes
APAR status
Closed as program error.
Error description
Error Description B2BAC 1.0.0.5 When IBM B2B Advanced Communications connects to IBM Sterling B2B Integrator, the Perimeter Server JAR gets the following error indicating an incorrect version. [2017-01-18 19:14:44,391] ALWAYS Detailed version number of peer does not match, received [b999] expecting [b4060602]
Local fix
STRTC - 40904 BB / BB Circumvention: There is no work around.
Problem summary
Users Affected: Perimeter Server Users Problem Descirption: When IBM B2B Advanced Communications connects to IBM Sterling B2B Integrator, the Perimeter Server JAR gets the following error indicating an incorrect version. [2017-01-18 19:14:44,391] ALWAYS Detailed version number of peer does not match, received [b999] expecting [b4060602] Platforms Affected: All
Problem conclusion
Resolution Summary: A code fix is provided. The Perimeter Server client JAR version is updated to V5.2.6.2. The fix is compatible only with IBM Sterling B2B Integrator's Perimter Server. So, you must install Perimeter Server from IBM Sterling B2B Integrator V5.2.6.2. Delivered In: 1005_3
Temporary fix
Comments
APAR Information
APAR number
IT19493
Reported component name
B2B ADV COMMUNI
Reported component ID
5725Q7200
Reported release
100
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2017-03-01
Closed date
2017-03-16
Last modified date
2017-04-14
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
B2B ADV COMMUNI
Fixed component ID
5725Q7200
Applicable component levels
R100 PSY
UP
[{"Line of Business":{"code":"LOB59","label":"Sustainability Software"},"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSYJCD","label":"Multi-Enterprise Integration Gateway"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"1.0.0"}]
Document Information
Modified date:
26 September 2021