IBM Support

IT13813: MAPPING NODE ERROR AFTER VALID AND INVALID MESSAGES

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • After a message fails validation in a Mapping node, the next
    message may fail as well, although the message is valid.
    
    The displayed error is:
    
    IXJXE0446E: [ERR 0395][ERR XPTY0004] The argument was expected
    to be a sequence containing no items or one item, but the value
    is a sequence containing more than one item. It is a type error
    if a value does not match a required type as specified by the
    SequenceType matching rules.
    

Local fix

  • NA
    

Problem summary

  • ****************************************************************
    USERS AFFECTED:
    All users of IBM Integration Bus v9.0 using the Mapping node.
    
    
    Platforms affected:
    z/OS, MultiPlatform
    
    ****************************************************************
    PROBLEM DESCRIPTION:
    After a message fails in a Mapping node due to a message
    parser/validation error, the next message processed by the
    Mapping node may fail as well, although it is valid.
    
    The displayed error can vary, but will be unexpected for the
    valid message data, and may be like the following:
    
    IXJXE0446E: [ERR 0395][ERR XPTY0004] The argument was expected
    to be a sequence containing no items or one item, but the value
    is a sequence containing more than one item. It is a type error
    if a value does not match a required type as specified by the
    SequenceType matching rules.
    
    There are a number of resource name changes between WebSphere
    Message Broker and IBM Integration Bus Version 9.0.  For details
    visit
    http://pic.dhe.ibm.com/infocenter/wmbhelp/v9r0m0/topic/com.ibm.e
    tools.mft.doc/bb23814_.htm
    

Problem conclusion

  • The Mapping node is corrected so that the processing of a valid
    message after a failed message no longer fails due to unexpected
    errors
    
    ---------------------------------------------------------------
    The fix is targeted for delivery in the following PTFs:
    
    Version    Maintenance Level
    v8.0       8.0.0.8
    v9.0       9.0.0.6
    
    The latest available maintenance can be obtained from:
    http://www-01.ibm.com/support/docview.wss?rs=849&uid=swg27006041
    
    If the maintenance level is not yet available,information on
    its planned availability can be found on:
    http://www-1.ibm.com/support/docview.wss?rs=849&uid=swg27006308
    ---------------------------------------------------------------
    

Temporary fix

Comments

APAR Information

  • APAR number

    IT13813

  • Reported component name

    INTEGRATION BUS

  • Reported component ID

    5724J0530

  • Reported release

    900

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2016-02-17

  • Closed date

    2016-06-09

  • Last modified date

    2016-09-09

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    INTEGRATION BUS

  • Fixed component ID

    5724J0530

Applicable component levels

  • R900 PSY

       UP

[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSNQK6","label":"IBM Integration Bus"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"9.0","Edition":"","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
23 March 2020