APAR status
Closed as program error.
Error description
A Graphical Data Map solution which includes multiple chains of submaps, where a common submap is called from points in several chains can fail with an error of the form: BIP3946E The map script generation for QName ' routine>' has failed, with the following details: 'Exception IXJXE0873E: [ERR 0614] Errors were encountered during compilation of the expression' Additionally service trace will show a preceding event of the form: IXJXE1029E: [ERR XQ10411][XQST0034] The library module function '' with arity '' has already been declared in the importing module or in another imported module.
Local fix
The issue can only be avoided by removing the calls to the identified 'submap routine', refactoring the logic inline in the calling map.
Problem summary
**************************************************************** USERS AFFECTED: All users of IBM Integration Bus who use the Mapping node with Graphical Data Maps that include multiple submaps that call nested submaps where a common submap is called from points in several chains. Platforms affected: MultiPlatform, z/OS **************************************************************** PROBLEM DESCRIPTION: An Integration Bus application or service that includes Graphical Data Maps which include multiple chains of submaps, where a common submap is called from points in several chains can fail with an error of the form: BIP3946E The map script generation for QName '' has failed, with the following details: 'Exception IXJXE0873E: [ERR 0614] Errors were encountered during compilation of the expression' Additionally a service trace of the failure will show a preceding event of the form: IXJXE1029E: [ERR XQ10411][XQST0034] The library module function '' with arity '' has already been declared in the importing module or in another imported module. There are a number of resource name changes between WebSphere Message Broker and IBM Integration Bus Version 9.0. For details visit http://pic.dhe.ibm.com/infocenter/wmbhelp/v9r0m0/topic/com.ibm.e tools.mft.doc/bb23814_.htm
Problem conclusion
The Graphical Data Map runtime component is corrected so that maps which include multiple chains of submaps, where a common submap is called from points in several chains, can be successfully deployed and executed. --------------------------------------------------------------- The fix is targeted for delivery in the following PTFs: Version Maintenance Level v9.0 9.0.0.6 v10.0 10.0.0.2 The latest available maintenance can be obtained from: http://www-01.ibm.com/support/docview.wss?rs=849&uid=swg27006041 If the maintenance level is not yet available,information on its planned availability can be found on: http://www-1.ibm.com/support/docview.wss?rs=849&uid=swg27006308 ---------------------------------------------------------------
Temporary fix
Comments
APAR Information
APAR number
IT08986
Reported component name
INTEGRATION BUS
Reported component ID
5724J0530
Reported release
900
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2015-05-19
Closed date
2015-09-11
Last modified date
2016-03-16
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
INTEGRATION BUS
Fixed component ID
5724J0530
Applicable component levels
R900 PSY
UP
[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSNQK6","label":"IBM Integration Bus"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"9.0","Edition":"","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
23 March 2020