Fixes are available
APAR status
Closed as program error.
Error description
When using XSL Transforms in Lazy Parsing mode in a mediation under load a timing issue in the code can arise when 2 or more threads try to access the same XSL transform at the same time. This can result in 100% CPU usage which remains until the server is restarted.
Local fix
Problem summary
**************************************************************** USERS AFFECTED: Users of Business Process Manager v8.5 who use XSL Transforms under load **************************************************************** PROBLEM DESCRIPTION: When running under load an issue with the XSL Transforms can cause the CPU to jump to 100% utilization and remain there until the server is recycled.
Problem conclusion
If two or more threads were using the same preparedTransform instance at the same time, as might happen under load, then this would cause an issue that would see the CPU utilization rise to 100%. To avoid this the use of preparedTransform was protected to avoid two threads using it at the same time.
Temporary fix
Comments
APAR Information
APAR number
IT05286
Reported component name
WESB IN BPM
Reported component ID
AIMCMFC00
Reported release
850
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2014-11-04
Closed date
2015-03-23
Last modified date
2015-03-23
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
WESB IN BPM
Fixed component ID
AIMCMFC00
Applicable component levels
R850 PSY
UP
[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSC2KE9","label":"Mediation"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.5","Edition":"","Line of Business":{"code":"","label":""}}]
Document Information
Modified date:
23 March 2015