Fixes are available
Refresh Pack 5.2.2 (June 2014) for Tivoli Storage Productivity Center
Refresh Pack 5.2.3 (August 2014) for Tivoli Storage Productivity Center
Fix Pack 5.2.4 (November 2014) for Tivoli Storage Productivity Center
Fix Pack 5.2.4.1 (December 2014) for Tivoli Storage Productivity Center
Refresh Pack 5.2.5 (March 2015) for Tivoli Storage Productivity Center (withdrawn)
Fix Pack 5.2.5.1 (April 2015) for Tivoli Storage Productivity Center (withdrawn)
Refresh Pack 5.2.6 (June 2015) for Tivoli Storage Productivity Center
Refresh Pack 5.2.7 (August 2015) for Tivoli Storage Productivity Center
IBM Spectrum Control V5.2.8 (December 2015)
IBM Spectrum Control V5.2.9 (February 2016)
IBM Spectrum Control V5.2.10 (May 2016)
IBM Spectrum Control V5.2.10.1 (July 2016)
IBM Spectrum Control V5.2.11 (August 2016)
IBM Spectrum Control V5.2.12 (November 2016)
IBM Spectrum Control V5.2.13 (March 2017)
IBM Spectrum Control V5.2.14 (May 2017)
IBM Spectrum Control V5.2.15 (August 2017)
IBM Spectrum Control V5.2.15.2 (November 2017)
IBM Spectrum Control V5.2.16 (March 2018)
IBM Spectrum Control V5.2.17 (May 2018)
Fix Pack 5.2.7.1 (February 2016) for Tivoli Storage Productivity Center
APAR status
Closed as program error.
Error description
Before upgrading to 5.2, the customer is using Standard Subsystem Group to schedule the probe jobs. "All Hypervisors" to schedule all the hypervisors, and jobs are scheduled to run "Mon, Wed, Fri". After the upgrade the customer is not able to change the Probe schedules for any of the subsystems and hypervisors. The main problem is that schedules are set to run on "Mon, We, Fri". Any customer who were using the option "Run on these days" will have potential of running into this problem after upgrading to 5.2.
Local fix
Call IBM support.
Problem summary
**************************************************************** * USERS AFFECTED: * * TPC 5.2 users who upgraded from 5.1.x and are trying to * * modify jobs scheduled to run on certain days. * **************************************************************** * PROBLEM DESCRIPTION: * * See ERROR DESCRIPTION * **************************************************************** * RECOMMENDATION: * * Apply fix maintenance when available. * ****************************************************************
Problem conclusion
A code change was made to allow the user to modify the jobs scheduled to run on certain days. The fix for this APAR is targeted for the following maintenance package: | refresh pack | 5.2-TIV-TPC-RP0001 - target March 2014 http://www-01.ibm.com/support/docview.wss?&uid=swg21320822 The target dates for future refresh packs or fix packs do not represent a formal commitment by IBM. The dates are subject to change without notice.
Temporary fix
Comments
APAR Information
APAR number
IC98405
Reported component name
TPC
Reported component ID
5608TPC00
Reported release
520
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2013-12-18
Closed date
2014-01-24
Last modified date
2014-01-24
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Modules/Macros
WEBUI
Fix information
Fixed component name
TPC
Fixed component ID
5608TPC00
Applicable component levels
R520 PSY
UP
Document Information
Modified date:
23 March 2022