APAR status
Closed as program error.
Error description
Error Description: It is possible for CDP backups to open a large number of connections to a WebDav server. This is due to the following commands resulting in a file being backed up twice, in some cases simultaneously, if c:\mydir has files in it that fit the scheduled backup include list. fpa synchronize list="c:\mydir" wait=1 fpa backup wait=1 Continuous Data Protection Versions Affected: 310 Initial Impact: Low Additional Keywords: CDP
Local fix
Problem summary
When backing up to a WebDav server a large numb er of connection can be opened when doing fpa synchronize comman ds that resulted in simultaneous backups.
Problem conclusion
Fixed in version 3.1.7.5
Temporary fix
Comments
APAR Information
APAR number
IC71345
Reported component name
TIV CONT DP FOR
Reported component ID
5608CDFCL
Reported release
310
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2010-09-22
Closed date
2010-09-24
Last modified date
2010-09-24
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
IC71463
Modules/Macros
UNKNOWN
Fix information
Fixed component name
TIV CONT DP FOR
Fixed component ID
5608CDFCL
Applicable component levels
R310 PSY
UP
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SS3PE6","label":"Tivoli Continuous Data Protection for Files"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"310","Edition":"","Line of Business":{"code":"LOB26","label":"Storage"}}]
Document Information
Modified date:
24 September 2010