PTF Cover Letter
PTF ( Program Temporary Fixes ) Cover letter
OSP-DB Resync not initiated during IASP Vary On
Pre/Co-Requisite PTF / Fix List
REQ LICENSED PTF/FIX LEVEL
TYPE PROGRAM REL NUMBER MIN/MAX OPTION
---- -------- --- ------- ------- ------
PRE 5770SS1 710 SI40309 00/00 0000
NOTICE:
-------
Application of this PTF may disable or render ineffective programs that
use system memory addresses not generated by the IBM translator,
including programs that circumvent control technology designed to limit
interactive capacity to purchased levels. This PTF may be a prerequisite
for future PTFs. By applying this PTF you authorize and agree to the
foregoing.
This PTF is subject to the terms of the license agreement which
accompanied, or was contained in, the Program for which you are obtaining
the PTF. You are not authorized to install or use the PTF except as part
of a Program for which you have a valid Proof of Entitlement.
SUBJECT TO ANY WARRANTIES WHICH CAN NOT BE EXCLUDED OR EXCEPT AS EXPLICITLY
AGREED TO IN THE APPLICABLE LICENSE AGREEMENT OR AN APPLICABLE SUPPORT
AGREEMENT, IBM MAKES NO WARRANTIES OR CONDITIONS EITHER EXPRESS OR IMPLIED,
INCLUDING BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OR CONDITIONS OF
MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, AND NON INFRINGEMENT,
REGARDING THE PTF.
The applicable license agreement may have been provided to you in printed
form and/or may be viewed using the Work with Software Agreements (WRKSFWAGR)
CL command.
APAR Error Description / Circumvention
-----------------------------------------------
After IPL or IASP Vary On, the Work with Commitment Definitions
(WRKCMTDFN) command lists several commitment definitions
indicating two-phase commit resynchronization is in progress,
even though the resynchronization was canceled before the system
was restarted. Furthermore, there is no indication of
commitment control recovery having been performed for those
commitment definitions during the IPL or Vary On.
CORRECTION FOR APAR SE45956 :
-----------------------------
A problem was found in the commitment control recovery logic
that caused recovery to be skipped for some commitment
definitions when multiple commitment definitions from the same
original job survived the IPL or IASP Vary On. This problem
will be fixed so that all such commitment definitions are
recovered.
CIRCUMVENTION FOR APAR SE45956 :
--------------------------------
None.
Activation Instructions
None.
Special Instructions
None.
Default Instructions
THIS PTF CAN BE APPLIED IMMEDIATE OR DELAYED.
Supersedes
PTF/FIX NO(S). APAR TITLE LINE
-------------- ------------------------------------------------------------
SI41644 OSP-IPL-WAIT IPL hangs at SRC C9002AA1
SI40781 OSP-DB-T/QTNIPLSV-MSGMCH3601 Commit Vary On recovery issues
SI40294 OSP-DB-OTHER Do not initiate resync when varying on IASP cop
SI39013 OSP-DB Internal Maintenance
Summary Information
System.............................. | i |
Models.............................. | |
Release............................. | V7R1M0 |
Licensed Program............... | 5770SS1 |
APAR Fixed.......................... | View details for APAR SE45956 |
Superseded by:...................... | View fix details for PTF SI43500 |
Recompile........................... | N |
Library............................. | QSYS |
MRI Feature ........................ | NONE |
Cum Level........................... | C1116710 |
IBM disclaims all warranties, whether express or implied, including, but not limited to, the implied warranties of merchantability and fitness for a particular purpose. By furnishing this document, IBM grants no licenses to any related patents or copyrights. Copyright © 1996,1997,1998, 1999, 2000, 2001, 2002, 2003, 2004, 2005, 2006, 2007, 2008, 2009, 2010, 2011, 2012, 2013, 2014, 2015, 2016, 2017 IBM Corporation. Any trademarks and product or brand names referenced in this document are the property of their respective owners. Consult the Terms of use link for trademark information.
Was this topic helpful?
Document Information
Modified date:
06 December 2010