IBM Support

IZ69267: HOSTS:PHASE 2 NEGOTIATION FAILS FOR SIMULTANEOUS INITILIZATION APPLIES TO AIX 5300-10

A fix is available

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • Phase 2 tunnels will be failed to get activated when both
    Host A & B tries to activate the tunnel simultaneously.
    This will result in logging the following error while
    decrypting the first phase 2 message in the syslog:
    "Error in Parsing the hash payload".
    

Local fix

Problem summary

  • Following error is logged in syslog
    "Error in Parsing the Hash payload".
    

Problem conclusion

  • With the fix, isakmpd is generating the message id using the
    random numbers so that the message id will not be same in case
    simultaneous initialization on both the hosts.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IZ69267

  • Reported component name

    AIX 5.3

  • Reported component ID

    5765G0300

  • Reported release

    530

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Submitted date

    2010-02-02

  • Closed date

    2010-02-02

  • Last modified date

    2013-04-06

  • APAR is sysrouted FROM one or more of the following:

    IZ54731

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    AIX 5.3

  • Fixed component ID

    5765G0300

Applicable component levels

  • R530 PSY U830076

       UP10/03/23 I 1000

PTF to Fileset Mapping

[{"Business Unit":{"code":"BU054","label":"Systems w\/TPS"},"Product":{"code":"SG11P","label":"APARs - AIX 5.3 environment"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"530","Edition":"","Line of Business":{"code":"","label":""}}]

Document Information

Modified date:
06 April 2013