| 31. | A leading foodservice organization consolidated to IBM® Power Systems™ servers and migrated to IBM DB2®, using Deep Compression to reduce data volumes by 56 percent. The company implemented IBM Storwize® V7000 storage systems to create a fully virtualized, integrated data s... | 23 May 2012 |
|---|
| 32. | Working with IBM, Cnam deployed two IBM® XIV® Storage Systems, synchronously mirrored and supporting a full SAP production chain in a virtualized environment running on blade servers. | 18 May 2012 |
|---|
| 33. | Deployed a virtualized multiworkload storage environment based on IBM XIV Storage System for all applications, including SAP ERP, running on IBM Power Systems™ and IBM System x servers. | 12 Mar 2012 |
|---|
| 34. | By selecting IBM XIV Storage System as its strategic platform for data storage for SAP ERP, TCCT improved performance by 20 percent while reducing capital and operational costs. The solution also reduces complexity, improves scalability and enables rapid disaster recovery. | 26 Feb 2012 |
|---|
| 35. | Working with IBM Global Business Services, Roma Capitale created a solution called “Digital Managerial Legal Document,” based on IBM servers running the AIX operating system, with SAP NetWeaver Composition Environments, SAP Adobe Interactive forms and Digital Signature Priva... | 16 Feb 2012 |
|---|
| 36. | This paper describes an implementation of the SAP Business Suite on IBM Power Systems server with IBM i at Multivac GmbH & Co. KG, Germany. | 09 Jan 2012 |
|---|
| 37. | WIBERG, a developer, producer and service provider in the food industry, implemented an integrated solution to improve the availability, business continuity, manageability and performance of its SAP and non-SAP solutions. | 21 Dec 2011 |
|---|
| 38. | Working with IBM and IBM Business Partner PROFI Engineering Systems, Burda Digital Systems implemented IBM BladeCenter servers and IBM System x3650 M3 servers supported by a virtualized storage solution based on an IBM SAN Volume Controller stretched cluster connected to IBM... | 21 Dec 2011 |
|---|
| 39. | The company now operates an easy-to-manage, high-availability storage area network spanning across two sites. IBM Power Systems servers running AIX, and IBM System x servers running Microsoft Windows Server and Linux operating systems on a VMware virtualization layer, both a... | 16 Dec 2011 |
|---|
| 40. | This paper describes the transformation of a traditional three-tier SAP software landscape with standard SAN storage to a fully virtualized environment based on IBM Power Systems with IBM PowerVM and IBM XIV Storage Systems. Along the way, the customer has reduced complexity... | 12 Dec 2011 |
|---|
| 41. | This transportation company replaced its Sun and Oracle systems with two IBM Power Systems 770 servers for its core SAP applications, and migrated its data to IBM DB2. The company also replaced its Hitachi Data Systems storage array with an IBM System Storage DS8300. | 18 Nov 2011 |
|---|
| 42. | Consolidated core SAP® applications to two IBM® Power® 770 servers running IBM AIX® and IBM DB2®, and implemented IBM WebSphere® eXtreme Scale to provide super-fast web performance. IBM WebSphere Application Server and IBM WebSphere Virtual Enterprise components help Apple V... | 20 Oct 2011 |
|---|
| 43. | The company consolidated its 26 SAP instances, two legacy Baan systems and 60 other custom applications to four IBM Power 770 servers. A total of 11 older storage devices were replaced by two IBM XIV Storage Systems, one at each data center. | 12 Oct 2011 |
|---|
| 44. | The university implemented a fully cloud-enabled infrastructure based on the IBM Power platform that automates many administration tasks and greatly accelerates preparation for the new semester. | 10 Oct 2011 |
|---|
| 45. | Using Microsoft Hyper-V™ virtualization on IBM System x3550 M2 servers to run multiple instances of Windows Server 2008 R2, it was possible to consolidate the entire former infrastructure to just six physical systems. | 04 Oct 2011 |
|---|
| 46. | Working with IBM, the group replaced its outdated infrastructure with SAP ERP solutions and IBM Power 570 servers. This met the company’s requirement for a scalable platform that would serve its needs for at least 10 years. | 06 Sep 2011 |
|---|
| 47. | This case study shows how Panduit Corp., a provider of end-to-end technology solutions to help companies connect, manage and automate communications, computing, power, control and security systems, deployed two IBM Power 570 servers to improve the availability, reliability a... | 11 Aug 2011 |
|---|
| 48. | Landgard selected an outsourced SAP solution with a wide area network connection to an IBM Global Technology Services Strategic Outsourcing data center. | 09 Aug 2011 |
|---|
| 49. | Working with IBM® and Base-IT, the INTERSPORT Austria IT team created and deployed a new optimized technology architecture designed to support the business for the long term, based on full virtualization of both servers and storage, and using solid state drives for the most ... | 29 Jul 2011 |
|---|
| 50. | This brochure outlines how IBM helped a world leader in energy modernize and simplify its existing, siloed HP infrastructure into a state-of-the art IT backbone. Its business-critical SAP components now run in a fully virtualized and resilient IBM POWER and AIX environment, ... | 18 Jul 2011 |
|---|
| 51. | Farmacéuticos Maypo selected SAP ERP, SAP ERP HCM, SAP SRM, SAP NetWeaver MDM, SAP NetWeaver BPM, SAP NetWeaver PI. The SAP applications run on leased IBM systems, including two IBM Power 570 servers and IBM BladeCenter JS43 Express, running IBM AIX and IBM DB2 database. | 08 Jul 2011 |
|---|
| 52. | The University implemented a fully cloud-enabled infrastructure based on the IBM Power Systems platform that automates many administration tasks and greatly accelerates preparation for the new semester. | 06 Jul 2011 |
|---|
| 53. | Working with IBM and SAP, TKES extended its existing SAP and PSImetals landscape to four additional locations, and implemented SAP Advance Planning and Optimization. TKES runs its SAP Business Suite applications on IBM Power 770, IBM Power 570 and IBM BladeCenter HS22 server... | 06 Jul 2011 |
|---|
| 54. | Nattura Labs switched from an HP environment to two IBM Power servers and IBM System x and upgraded its SAP Business All-in-One software to provide a highly available, reliable and robust infrastructure. The IBM solution enables Nattura Labs to create a solid IT backbone and... | 29 Jun 2011 |
|---|
| 55. | B C Jindal standardized its SAP application infrastructure on IBM technologies, including IBM Power Systems, IBM System Storage, IBM Tivoli and IBM Systems Director. | 22 Jun 2011 |
|---|
| 56. | Denbury worked with IBM Business Partner VSS to upgrade to IBM® Power® 770 servers, and replaced its existing disk systems with the IBM XIV® Storage System. | 07 Jun 2011 |
|---|
| 57. | Adolf Würth GmbH & Co. KG chose to upgrade from POWER6 to POWER7 processor-based systems using IBM Live Partition Mobility. The entire infrastructure upgrade and transition process (covering 80 logical partitions on IBM Power servers) took less than four months, and thanks t... | 14 Feb 2011 |
|---|
| 58. | Replaced SUN, HP and Dell hardware, operating systems and support contracts and standardized on the IBM Power 595 platform for SAP applications, and consolidated information storage to IBM System Storage DS8100, managed by IBM Tivoli Storage Manager. | 06 Jan 2011 |
|---|
| 59. | American Crystal Sugar implemented IBM XIV Storage System with 27 TB capacity, enabling older storage systems to move into backup and recovery roles. The company also upgraded to IBM Power 770 servers featuring IBM POWER7 processor technology. These IBM solutions support a b... | 23 Dec 2010 |
|---|
| 60. | CIBER Managed Services GmbH built a dynamic Cloud Infrastructure for SAP landscapes, based on a combination of IBM server, storage, database, and system management software. The new storage infrastructure consists of the IBM XIV Storage System and IBM SAN Volume Controller (... | 22 Dec 2010 |