Published on 06 Aug 2007
Validated on 04 Jan 2010
"The IBM and APC solution is more efficient, targeting cooling on the components that need it, rather than wasting energy chilling the surrounding air." - Rich Siedzik, Director of Computer and Telecommunication Services, Bryant University
Customer:
Bryant University
Industry:
Education
Deployment country:
United States
Solution:
Energy Efficiency, Optimizing IT
IBM Business Partner:
APC Corporation
Overview
Rapid growth in the use of IT by students and faculty members was putting Bryant’s infrastructure under intense pressure. The organization lacked a true enterprise-class data center, and its existing computer sites were reaching their limits in terms of space, power and cooling capacity.
Business need:
Bryant University’s decentralized IT infrastructure was costly, inefficient and increasingly unable to scale to growing demands for IT services. The organization needed to consolidate to an enterprise-class data center.
Solution:
Bryant University implemented an IBM Scalable Modular Data Center solution with advanced InfraStruXure® architecture from IBM Alliance Partner APC. The organization standardized on IBM BladeCenter® as its platform for virtualized Microsoft® Windows® and Linux® servers. As well as saving on power and cooling costs, the University can now provision new virtual servers in less than one day.
Benefits:
Reduced physical servers from 75 to 40
40 to 50 percent reduction in floorspace requirements
Contributed to reduced carbon footprint and reduced power consumption/cooling
Case Study
Based in Smithfield, RI, Bryant University has 3,200 undergraduate students from 31 US states and 32 countries around the globe, and a further 400 graduate students. Bryant has a proud history of excellence and innovation, and was recently named one of the “Top 25 Most Connected Campuses” in The Princeton Review.
Rapid growth in the use of IT by students and faculty members was putting Bryant’s infrastructure under intense pressure. The organization lacked a true enterprise-class data center, and its existing computer sites were reaching their limits in terms of space, power and cooling capacity.
By selecting an IBM Scalable Modular Data Center solution with APC’s InfraStruXure® architecture, IBM designed and built an energy-efficient data center for Bryant at a fraction of the cost of a typical solution. Art Gloster, CIO, comments: “The IBM and APC solution delivered significant capital and operational cost savings, providing a compact yet highly scalable infrastructure. We estimate that the solution is 30 percent more efficient in power and cooling terms alone, both reducing expenditure and underlining the University’s commitment to environmental sustainability.”
Out-of-the-box solution
Bryant’s decentralized infrastructure—75 servers across three rooms—was inefficient, with average utilization under 10 percent. Most of the servers had no UPS, raising the risk for the organization, and the lack of standardization made them difficult to manage. Bryant embarked on a program of centralization and consolidation, planning to virtualize its existing servers and run them on standardized hardware in a purpose-built data center.
“We consulted several vendors, and it was clear that IBM had the edge in terms of innovative ideas,” says Gloster. “IBM brought APC to the table, and together they showed how we could gain a robust, compact and highly efficient data center at less than 20 percent of the cost of a standard raised-floor alternative.”
IBM proposed a complete turn-key data center solution using the IBM BladeCenter servers and the IBM Scalable Modular Data Center infrastructure, utilizing the APC InfrStuXure architecture, for a complete, energy- and space-efficient solution. The IBM solution provided the necessary power and cooling, which is both modular and scalable, utilizing a targeted InRow™ cooling solution, which is very energy efficient compared to perimeter cooling, which simply pumps cold air through the entire data center, even in areas where it is not needed.
During the design phase, the location of the data center changed several times; IBM and APC were flexible enough to be able to adjust the design rapidly and at low cost.
“The joint team planned the deployment extremely well, and the bulk of the actual installation was completed within just four days,” says Rich Siedzik, Director of Computer and Telecommunication Services. “The quality of the engineering work and project management from IBM was outstanding.”
Targeted cooling
Bryant virtualized its 75 physical servers, moving them to just 40 physical servers in the new data center. Any new systems the University decides to implement will also be virtualized and run on the existing physical servers, significantly reducing the ongoing expenditure on hardware.
“We expect to add one new virtual server every month, and there is still plenty of capacity on the current 40 physical servers,” says Gloster. “Previously, that would have meant buying and installing 12 new physical machines, then paying the additional power and cooling costs over their full lifecycle.”
“When they come into the data center, many people remark that it feels too warm—they are accustomed to heavily air-conditioned data centers,” says Siedzik. “The IBM and APC solution is more efficient, targeting cooling on the components that need it, rather than wasting energy chilling the surrounding air.”
Faster and greener
Beyond the cost and energy efficiency advantages of server virtualization, Bryant also benefits from accelerated provisioning. Rich Siedzik estimates that it would typically take up to nine weeks to deploy a new physical server. He says, “We can deploy a new virtual server image almost instantaneously and complete the provisioning process inside a day.”
Art Gloster concludes, “Through consolidation, virtualization and improved data center efficiency, Bryant University will significantly reduce long-term capital and operational expenditure. The IBM and APC solution should also enable the University to reduce its energy consumption and carbon footprint—a consideration that is becoming increasingly important for institutions like ours.”
Components
IBM products and services that were used in this case study.
Hardware:
BladeCenter, BladeCenter H Chassis, BladeCenter JS21, System p
Service:
GTS ITS Site & Facilities: IT Facilities Assess/Design/Constr
Legal Information
© Copyright IBM Corporation 2007 IBM Systems and Technology Group Route 100 Somers, NY 10589 U.S.A. IBM, the IBM logo and BladeCenter are trademarks or registered trademarks of International Business Machines Corporation in the United States, other countries or both. Linux is a registered trademark of Linus Torvalds in the United States, other countries or both. Microsoft and Windows are registered trademarks of Microsoft Corporation in the United States, other countries or both. Other company, product or service names may be trademarks or service marks of others. IBM and APC are separate companies and each is responsible for its own products. Neither IBM nor APC makes any warranties, express or implied, concerning the other’s products. References in this publication to IBM products, programs or services do not imply that IBM intends to make these available in all countries in which IBM operates. Any reference to an IBM product, program or service is not intended to imply that only IBM’s product, program or service may be used. Any functionally equivalent product, program or service may be used instead. Offerings are subject to change, extension or withdrawal without notice. All client examples cited represent how some clients have used IBM products and the results they may have achieved. Performance data for IBM and non-IBM products and services contained in this document was derived under specific operating and environmental conditions. The actual results obtained by any party implementing such products or services will depend on a large number of factors specific to such party’s operating environment and may vary significantly. IBM makes no representation that these results can be expected or obtained in any implementation of any such products or services. THE INFORMATION IN THIS DOCUMENT IS PROVIDED “AS-IS” WITHOUT ANY WARRANTY, EITHER EXPRESSED OR IMPLIED.