Skip to main content

IBM System Networking literature

Infrastructure service provider Altus IT ensured that it is a safe choice for client data when it transformed its network infrastructure with IBM System Networking RackSwitch G8124E and G8052 solutions, helping it guarantee a stable and secure service for...

October 2014 | PDF | 642 KB
Netherlands-based Zandbergen World’s Finest Meat tackled business continuity challenges by working with IBM Business Partner ExtraVar to replaced its existing infrastructure with a redundant dual datacenter concept based on IBM System x and IBM System ...

October 2013 | PDF | 599 KB
Europe Airpost worked with IBM Premier Business Partner Diademys to deploy an expert-integrated IBM PureFlex System solution – reducing the overall maintenance workload, improving cost-efficiency and freeing the IT team to focus on developing innovative ...

September 2013 | PDF | 681 KB
Working with IBM Business Partner Hamburgnet, SL-Rasch updated its network infrastructure with IBM® System Networking RackSwitchTM components to solve the data throughput challenges.

August 2013 | PDF | 543 KB
A new backbone was designed, built around the IBM® System Networking RackSwitchTM G8264 10/40 Gbit and the IBM System Networking RackSwitch G8052. IBM also provides a service package including software support and diagnostics.

May 2013 | PDF | 668 KB
IBM Business Partner, NetFactory GmbH, proposed a solution based on 24 IBM® BladeCenter® HS23 servers to improve performance, exploit virtualization, simplify system and network management, and reduce data center sprawl and inefficiency.

May 2013 | PDF | 627 KB
IBM Business Partner Antisa proposed a system upgrade to increase flexibility and availability, and lower maintenance, latency and energy consumption. New IBM server assets were deployed, along with IBM network switches that support Sarenet’s future plans...

May 2013 | PDF | 579 KB
IBM Business Partner DHDS undertook a network backbone upgrade project to increase the speed, capacity, and flexi-bility of the link between Bonar’s mirrored data center facilities.

May 2013 | PDF | 646 KB
Six IBM® System Networking RackSwitchTM G8264 switches were installed across three locations and connected using IBM BladeCenter® Virtual Fabric.

May 2013 | PDF | 714 KB

Adobe Acrobat ReaderPDF files require Adobe® Reader®